Laserfiche WebLink
r <br />Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Distribute topsoil over 50 acres maximum disturbance <br />Site: Meeker Pit Permit Action: SIA Permit/Job #: M1976038 <br />PROJECT IDENTIFICATION <br />Task #: 02A State: Colorado <br />Date: 3 52014 County: Rio Blanco <br />User: THM <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT <br />- Scraper: <br />- Dozer: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance -Motor Grader: <br />-Water Truck: <br />Abbreviation: None <br />Filename: M038 -02a <br />COSTShift basis: der day <br />Equipment Description <br />Cat 627G w, push -pull <br />Cat D8T - 8SU <br />Cat D8T - 8SU <br />Cat D8T - 8SU <br />CAT 120M <br />Water Tanker, 7,000 Gal. <br />Cost Breakdown: <br />Scraper Work Team <br />Dump Area <br />Scraper <br />Dozer <br />%Util ization- machine: <br />100 <br />100 <br />Ownership cost/hour: <br />$65.78 <br />$56.69 <br />Operating cost/hour: <br />$182.63 <br />$104.03 <br />+ <br />1 $198.13 <br />$198.13 <br />Ripper op. cost/hour: . <br />NA <br />$0.00 <br />Operator cost/hour: <br />$30.02 <br />$37.41 <br />Unit Subtotals: <br />$278.43 <br />$198.13 <br />+ <br />Number of Units: <br />8 <br />1 <br />Group Subtotals: <br />Work: <br />$2,425.57 <br />Total work team cost/hour: $3.029.62 <br />MATERIAL OUANTITIES <br />Support Equipment <br />Load Area <br />Dump Area <br />100 <br />100 <br />+ T <br />$56.69 <br />$56.69 <br />$104.03 <br />$104.03 <br />$0.00 <br />$0.00 <br />$37.41 <br />$37.41 <br />} <br />1 $198.13 <br />$198.13 <br />1 <br />f- <br />1 <br />Support: <br />$396.26 <br />Initial volume: 40,333 CCY Swell factor: 1.125 <br />Loose volume: 45 375 LCY <br />Source of estimated volume: Division of Reclamation, Minin � & Safe;, <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,550 Ibs/LCY <br />Material description: <br />Earth - Dry packed <br />Rated Payload: <br />52,800 pounds <br />Payload Capacity: <br />20.71 LCY <br />Maintenance Equipment <br />Motor Grader Water Truck <br />100 <br />100 <br />$22.17 <br />$33.04 <br />$41.62 <br />$83.41 <br />$0.00 <br />$0.00 <br />$27.55 <br />$0.00 <br />$91.34 <br />1 <br />$116.45 <br />Maint: <br />1 <br />$207.79 <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.85 <br />1 CY <br />CIRCES Cost Estimating Software <br />