My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-03-05_REVISION - M1976038
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1976038
>
2014-03-05_REVISION - M1976038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 12:18:59 PM
Creation date
3/5/2014 4:48:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1976038
IBM Index Class Name
REVISION
Doc Date
3/5/2014
Doc Name
Bond update SL01
From
DRMS
To
Meeker Sand & Gravel, Inc.
Type & Sequence
SL1
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Final Reclamation Cost Estimate <br />Site: Meeker Pit Permit Action: SI -I <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 3'5 2014 County: Rio Blanco <br />User: THM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permi Job • M1976038 <br />Abbreviation: None <br />Filename: M038 -001 <br />Task <br />Descri tion <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />Ola <br />02a <br />03a <br />04a <br />Re-grade Hi hwall to 31-1: IV Slopes <br />DOZER <br />2 <br />2 <br />1 <br />1 <br />29.61 <br />$11,733.05 <br />$46,860.89 <br />$52,910.00 <br />$9,781.20 <br />Distribute topsoil over 50 acres maximum <br />disturbance <br />SCRAPERI <br />15.47 <br />Reve etate a maximum disturbance of 50 acres <br />REVEGE <br />I <br />16.00 <br />Mobilization <br />MOBILIZE <br />2.53 <br />SUBTOTALS: <br />63.61 <br />$121,285.14 <br />INDIRECT COSTS <br />Liability insurance: <br />2.02% <br />Total = <br />$2,449.96 <br />Performance bond: <br />1.05% <br />Total = <br />$1,273.49 <br />Job superintendent: <br />31.81 hrs <br />Total = <br />$2,080.37 <br />Profit: <br />10.00% <br />Total = <br />$12,128.51 <br />TOTAL O & P = <br />$17,932.33 <br />CONTRACT AMOUNT (direct + O & P) = <br />$139,217.47 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): 500.00 Total = 500.0 <br />Engineering work and/or contract/bid preparation: 0.0010 Total = $0.00 <br />Reclamation management and/or administration: 5.0010 $6,96087 <br />CONTINGENCY: 3.00 Total $3,63855 <br />TOTAL INDIRECT COST $29,031.76 <br />TOTAL BOND AMOUNT (direct + indirect) _ $150,316.90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.