Laserfiche WebLink
-4- <br />12. Primary future (Post- minins) Iand use (check one): <br />__j Cropland(CR) _J,_ -J Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Q Residential(RS) ❑ Recreation(RC) <br />-0 Developed Water Resources(WR) <br />13. Primary oresent land use check one : <br />Cropland(CR) Pastureland(PL) <br />Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial /Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Dozers, trackhoes and front -end loaders and trucks will be used to remove overburden and excavate gravel. <br />15. On Site Processing: J l Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Front -end loaders and trucks will be used to transport material to crushing and screening area. Conveyors and front-end loaders will stockpile finished materiai.None. <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />None. <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />