My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-28_HYDROLOGY - M1977522
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977522
>
2014-02-28_HYDROLOGY - M1977522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:25 PM
Creation date
3/4/2014 3:47:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977522
IBM Index Class Name
HYDROLOGY
Doc Date
2/28/2014
Doc Name
Substitute water supply plan
From
Division of Water Resources
To
Parsons Water Consulting, LLC
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Rick Parsons, P.E. <br />L.G. Everist Combined SWSP <br />Page 8 of 10 <br />February 27, 2014 <br />10. The name, address, and phone number of the contact person who will be responsible for the <br />operation and accounting of this plan must be provided on the accounting forms submitted to the <br />division engineer and the water commissioner. <br />11. Conveyance loss for delivery of augmentation water to the South Platte River, Saint Wain Creek <br />and the Cache La Poudre River is subject to assessment and modification as determined by the <br />division engineer. <br />12. The Division Engineer, or his designated representative, will administer all such water transported <br />in the South Platte River or its tributaries under this SWSP, including water for replacement of <br />depletions, past intervening headgate to ensure that such water is not intercepted or otherwise <br />diminished in quantity by diversion, use or other interference by intervening water rights and to <br />assure that such water remains available and suitable for Applicant's uses under this SWSP, <br />except when any intervening headgate is diverting the entire flow of ( "sweeping ") the river. In the <br />event that delivery past headgate which sweep the river requires the installation of a bypass <br />structure or the use of an existing bypass structure by agreement with a third -party, Applicant is <br />responsible for either installation a new bypass structure with a continuous recording measuring <br />device(s) as approved by the Water Commissioner or securing an agreement with a third -party to <br />use an existing bypass structure and providing such information and agreement to the Division <br />Engineer. <br />13. All diversions shall be measured in a manner acceptable to the Division Engineer. The Applicant <br />shall install and maintain such measuring devices as required by the Division Engineer for <br />operation of this SWSP. In addition, the applicant shall maintain daily records of all diversions, <br />replacements, and the amount of water used for each particular purpose. The applicant shall <br />provide a report of these records to the division engineer and the water commissioner on a <br />monthly basis on a form approved by them. The accounting must be submitted to the division <br />engineer in Greeley (Div1Accounting ctc state.co.us) and the water commissioners (Bill Schneider at <br />William. Scneider(cr_state. co. us, Shera Sumerford at Shera.Sumerford(a)state.co.us and Mark <br />Simpson at Mark. Simpson(a)-state. co. us) within 30 calendar days of the end of the month for which <br />the accounting is being made. Submitted accounting shall conform to the Administration Protocol <br />— Augmentation Plan Accounting. <br />14. The Applicant is required to provide a written notification to the water commissioner and division <br />engineer by April 1 of 2014 and 2015 identifying the lands to be dried up for the 2014 and 2015 <br />irrigation season. The Applicant submitted an affidavit signed by James Sittner, Front Range <br />Project Manager, verifying the dry-up lands associated with L.G. Everist's Lupton Bottom Ditch <br />and Rural Ditch shares. This is accepted as the written notifications required by April 1 of 2014 <br />and 2015. By October 31 of 2014 and 2015 the Applicant shall provide an affidavit to the water <br />commissioner and division engineer that identifies and confirms the lands that were dried up <br />during the 2014 and 2015 irrigation season in order that the final determination of augmentation <br />credits for the irrigation season can be made along with mapping showing any revisions to the <br />dried -up acreage. The Applicant shall modify accounting to reflect that the credit from any dried <br />up fields containing alfalfa or native grass was assessed in the following manner: <br />(a) For fields deep tilled or chemically treated to successfully kill alfalfa or native grass, 100% <br />credit will be given for consumptive use as otherwise computed under the conditions of this <br />approval. <br />(b) For fields not deep tilled or chemically treated to successfully kill alfalfa, records of monthly <br />monitoring of depth to groundwater at existing irrigation wells or existing or new monitoring <br />wells or piezometers within % -mile of each alfalfa or native grass field must be maintained. <br />Credits will be reduced according to the following table when depth to groundwater is less <br />
The URL can be used to link to this page
Your browser does not support the video tag.