My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-28_HYDROLOGY - M1977522
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977522
>
2014-02-28_HYDROLOGY - M1977522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:25 PM
Creation date
3/4/2014 3:47:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977522
IBM Index Class Name
HYDROLOGY
Doc Date
2/28/2014
Doc Name
Substitute water supply plan
From
Division of Water Resources
To
Parsons Water Consulting, LLC
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 13 <br />Star Water Resource (DMG Permit No. M -77 -522) <br />January 2014 to December 2015 SWSP Accounting <br />(all values in acre -feet, unless otherwise noted) <br />Person Responsible for this plan. <br />Lynn Mayer Shults <br />303 286 2247 <br />(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) <br />DEPLETIONS <br />Jan-15 <br />V-' <br />aw <br />on�o <br />W0.' Why U <br />1 00 <br />V-4 <br />r <br />-0.02 <br />-0.02 <br />1 -0.10 <br />0.00 <br />0.00 <br />-0.10 <br />Table 13 <br />Star Water Resource (DMG Permit No. M -77 -522) <br />January 2014 to December 2015 SWSP Accounting <br />(all values in acre -feet, unless otherwise noted) <br />Person Responsible for this plan. <br />Lynn Mayer Shults <br />303 286 2247 <br />(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14) <br />DEPLETIONS <br />Jan-15 <br />2.0% <br />0.00 <br />1 00 <br />000 <br />-0.02 <br />-0.02 <br />1 -0.10 <br />0.00 <br />0.00 <br />-0.10 <br />Feb -15 <br />1.3% <br />0.00 <br />1.00 <br />-0.11 <br />-0.11 <br />-0.01 <br />-0.12 <br />-0.14 <br />0.00 <br />0.00 <br />-0.14 <br />Mar -15 <br />5.1% <br />000 <br />1.00 <br />-0.15 <br />-015 <br />-0.05 <br />-0.20 <br />-0.20 <br />0.00 <br />000 <br />-020 <br />A r -15 <br />9.4% <br />0.00 <br />1 00 <br />-026 <br />-0.26 <br />-0.09 <br />-0.35 <br />-031 <br />000 <br />000 <br />-0.31 <br />May-15 <br />9.6% <br />000 <br />1.00 <br />-021 <br />-0.31 <br />-0.10 <br />-0.40 <br />-0.37 <br />0.00 <br />0.00 <br />-0.37 <br />Jun -15 <br />10.5% <br />0.00 <br />100 <br />-0.44 <br />-0.44 <br />-0.11 <br />-0.55 <br />-0.47 <br />0.00 <br />0.00 <br />-0.47 <br />Jul-15 <br />1 9.9% <br />1 <br />0.00 <br />1.00 <br />-0.48 <br />1 -0.48 <br />-0.10 <br />-058 <br />-053 <br />000 <br />0.00 <br />-0.53 <br />Aug-1 5 <br />1 102% <br />0.00 <br />1.00 <br />-0,43 <br />-0.43 <br />-0.10 <br />-054 <br />-0.52 <br />000 <br />0.00 <br />-052 <br />Sep-1 5 <br />15.7% <br />000 <br />1.00 <br />-0.30 <br />-030 <br />-016 <br />-0.46 <br />-047 <br />0.00 <br />000 <br />-047 <br />Oct -15 <br />12.2% <br />0.00 <br />1.00 <br />-0.22 <br />-0.22 <br />-0.12 <br />-0.34 <br />-0.38 <br />0.00 <br />000 <br />-0.38 <br />Nov -15 <br />10.6% <br />0.00 <br />1 00 <br />-0 12 <br />-012 <br />-011 <br />-022 <br />-028 <br />000 <br />000 <br />-0.28 <br />Dec -15 <br />3.4% <br />0.00 <br />1.00 <br />000 <br />-0.03 <br />-0.03 <br />-0.13 <br />0.00 <br />0.00 <br />-0.13 <br />AL 2015 <br />100.0% <br />0 <br />0 <br />0 <br />0.00 <br />82 <br />-2.82 <br />1.00 <br />3 8 <br />3.90 <br />00 <br />00 <br />3.9 <br />Notes: <br />1. Percent of excavated material based on historical operations at permit area. - Accounting values based on measurements of actual tonnage. <br />2. Total excavated material of 0 tons in 2014 and 0 tons in 2015, distributed per (1). <br />3. and 4. Projected tons of material washed and not washed based on historical operations at permit area. Actual recorded values to be used in SWSP accounting. <br />5. Equal to 4% of washed material (3) + 2% of material not washed (4) <br />6. Exposed surface area outside of lined areas. <br />7. Net evaporation based on gross evaporation (NOAH NWS -33) less 70% of average precipitation (see Table 16). Set to zero for months with average mean temperature less than 32 degrees. <br />8. Equal to (6) . (7), Accounting values based on measurements of actual Ice cover. <br />9. 1 ac -ft in 2014 and 1 ac -ft in 2015. Distributed based on (1) <br />10. Equal to (5) + (8) + (9). <br />11. Equal to unlagged mining depletions (10), lagged back to Cache la Poudre River using AWAS program with following aquifer parameters. X =558 ft; W =4300 ft, T= 120000 gpd /ft, and S =0.2. Includes lagged <br />depletions from mining operations approved in previous Feit Pit SWSPs, <br />12. Based on estimated pumping of 0 gpm, on average, recorded at site. <br />13. Equal to unlagged dewatering pumping (12), lagged back to Cache la Poudre River using AWAS program with following aquifer parameters* X =558 ft; W =4300 ft; T= 120000 gpd /ft, and S-0.2. <br />14. Equal to (11) + (12) + (13). Negative values ( -) represent net depletions to river system. Positive values ( +) represent net accretions to river system <br />W,kl k C \son 1l, \LG Ell,ilt \S tlo LGL- IItn,UU 1y2014_ 2015 SVAP1 It 20131127 <br />WwkIl SUr 11/24/2012001AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.