Laserfiche WebLink
Page 2 of 3 <br />` 112c Annual Report <br />Permittee Name: <br />Martin Marietta Materials, <br />Inc. <br />Permit Number: <br />M -1974 -004 <br />Operation Name: <br />Specification Aggregates <br />Quarry <br />County: <br />Jefferson <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />February 15, 2014 <br />Permit Acreage: <br />325.00 <br />Current Bond Amt: <br />$1,453,291.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />YES NO <br />ESQ NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES (KO—) <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? D 1 L <br />5. Does the mine operate more than 180 days per year? YES NO <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES NO <br />b) approval for INTERMITTENT OPERATION? YES O <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). 5� IK O.6f <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. L <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />rti / 5 <br />seeded w/ <br />. S <br />w /topsoil <br />--'' <br />mulched w/ <br />/ { <br />approved mix: <br />replaced: <br />'- <br />approved mulch: <br />Total acres <br />�' S <br />Total acres <br />Topsoil <br />Mulch application <br />�f <br />graded: <br />fertilized w/ <br />A' 6(— <br />replacement <br />n, L <br />rate (tons /ac): <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />6r <br />Fertilizer <br />yj f �L— <br />Mulch <br />application <br />application <br />a-6c� <br />application <br />method: <br />(2�- C, f <br />method: <br />method: <br />