Laserfiche WebLink
Table 14 <br />L.G. Everist Cache la Poudre River Gravel Pits Summary <br />January 2014 to December 2015 SWSP Accounting <br />(all values in acre -feet, unless otherwise noted) <br />(1) (2) (3) <br />NET DEPLETIONS <br />Month <br />Star <br />Percent of <br />Month with <br />Call <br />Out -of- <br />Priority Net <br />Depletion <br />Jan -12 <br />-1.46 <br />100% <br />-1.46 <br />Feb-12 <br />1 -1.05 <br />100% <br />-1.05 <br />Mar -12 <br />-0.79 <br />100% <br />-0.79 <br />Apr-112 <br />-0.61 <br />100% <br />-0.61 <br />May -12 <br />-0.47 <br />100 % <br />-0.47 <br />Jun -12 <br />-067 <br />100% <br />-067 <br />Jul -12 <br />-0.69 <br />100% <br />-0.69 <br />Aug -12 <br />-0.64 <br />100% <br />-0.64 <br />Sep-12 <br />-0.55 <br />100% <br />-0.55 <br />Oct -12 <br />-0.44 <br />100% <br />-0.44 <br />Nov -12 <br />-0.33 <br />100% <br />-033 <br />Dec-12 <br />-0.16 <br />100% <br />-0.16 <br />TOTAL 2012 <br />-786 <br />0.66 <br />-7.86 <br />Jan -13 <br />-0.10 <br />100% <br />-0.10 <br />Feb-13 <br />-0.14 <br />100% <br />-0.14 <br />Mar -13 <br />-0.20 <br />100% <br />-0.20 <br />Apr -13 <br />-0.31 <br />100% <br />-0.31 <br />May -13 <br />-0.37 <br />100% <br />-0.37 <br />Jun -13 <br />-0.47 <br />100% <br />-0.47 <br />Jul -13 <br />1 -053 <br />100% <br />-053 <br />Aug -13 <br />-0.52 <br />100% <br />-0.52 <br />Sep-13 <br />-0.47 <br />100% <br />-0.47 <br />Oct -13 <br />-0.38 <br />100% <br />-0.38 <br />Nov -13 <br />-0.28 <br />100% <br />-028 <br />Dec-13 <br />-0.13 <br />100% <br />-0.13 <br />TOTAL 2013 <br />-3.90 <br />1 <br />3.90 <br />(4) (5) (6) (7) (8) (9) (10) <br />Rinn 3 Pit <br />Deliveries <br />Rinn 3 Pit <br />Transit <br />Losses <br />Rinn 3 Pit <br />Credits <br />Meadows <br />West Pit <br />Deliveries <br />Laramie Fox Meadows <br />West /LFH <br />Hill Well Transit <br />Pumping Losses <br />Meadows <br />West / LFH <br />Credits <br />010 <br />1 61 <br />-0.15 <br />146 <br />-0.01 <br />014 <br />116 <br />-0.11 <br />1.05 <br />-0.02 <br />0.20 <br />087 <br />-008 <br />0.79 <br />0.73 <br />-0.12 <br />0.61 <br />0.44 <br />-0.07 <br />0.56 <br />-0.09 <br />047 <br />0.56 <br />0.80 <br />-0.13 <br />0.67 <br />082 <br />-0.13 <br />0.69 <br />0.77 <br />-0.13 <br />0.64 <br />0.52 <br />0.66 <br />-0 11 <br />0.55 <br />-0.09 <br />047 <br />0.53 <br />-0.09 <br />0.44 <br />0.45 <br />-0.07 <br />038 <br />0.36 <br />-0.03 <br />033 <br />0.31 <br />0.18 <br />-002 <br />0.16 <br />4.87 <br />-080 <br />407 <br />1 4.17 <br />0.00 -038 <br />3.79 <br />Person Responsible <br />for this plan: <br />Lynn Mayer Shults <br />303.286.2247 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />000 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Notes: <br />1. See Table 13, Column (14). <br />2. Percent of month with call placed downstream of pits based on Water Division 1 records. - Accounting values based on actual recorded calls. <br />3. Equal to (1)' (2). Negative values ( -) represent net depletions to river system. Positive values ( +) represent net accretions to river system. <br />4. Based on recorded Rinn 3 Pit releases summarized in Table 15. <br />5. Based on transit loss over 32.7 miles to Cache la Poudre River confluence at summer (Apr - Oct) / vonter (Nov -Mar) loss rate of 0.50% / 0.25% per mile. <br />6. Equal to (4) + (5). <br />7. Based on recorded Meadows West Pit releases summarized in Table 15 <br />8. Based on recorded pumping from one or more of L.G Evenst's Laramie -Fox Hill wells (WDIDs 0210211, 0210212, and 0210213) summarized in Table. Includes 2% relinquishment r <br />9. Based on transit loss over 36.7 miles to Cache la Poudre River confluence at summer (Apr - Oct) / winter (Nov -Mar) loss rate of 0.50% / 0 25% per mile <br />10. Equal to (7) + (8) +(9) <br />11. Equal to (3) + (6) + (10) Negative values ( -) represent net depletions to river system. Positive values ( +) represent net accretions to river system. <br />0.11 <br />-0.01 <br />010 <br />0.15 <br />-0.01 <br />014 <br />0.22 <br />-0.02 <br />0.20 <br />0.37 <br />-0.06 <br />0.31 <br />0.44 <br />-0.07 <br />0.37 <br />0.56 <br />-0.09 <br />0.47 <br />0.63 <br />-0.10 <br />0.53 <br />0.62 <br />-0.10 <br />0.52 <br />0.56 <br />-0.09 <br />047 <br />0.45 <br />-0.07 <br />038 <br />0.31 <br />-0.03 <br />028 <br />0.14 <br />-0.01 <br />0.13 <br />3.65 <br />-0.60 <br />3.05 <br />0.94 <br />0.00 <br />-0.09 <br />0.85 <br />Person Responsible <br />for this plan: <br />Lynn Mayer Shults <br />303.286.2247 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />000 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Notes: <br />1. See Table 13, Column (14). <br />2. Percent of month with call placed downstream of pits based on Water Division 1 records. - Accounting values based on actual recorded calls. <br />3. Equal to (1)' (2). Negative values ( -) represent net depletions to river system. Positive values ( +) represent net accretions to river system. <br />4. Based on recorded Rinn 3 Pit releases summarized in Table 15. <br />5. Based on transit loss over 32.7 miles to Cache la Poudre River confluence at summer (Apr - Oct) / vonter (Nov -Mar) loss rate of 0.50% / 0.25% per mile. <br />6. Equal to (4) + (5). <br />7. Based on recorded Meadows West Pit releases summarized in Table 15 <br />8. Based on recorded pumping from one or more of L.G Evenst's Laramie -Fox Hill wells (WDIDs 0210211, 0210212, and 0210213) summarized in Table. Includes 2% relinquishment r <br />9. Based on transit loss over 36.7 miles to Cache la Poudre River confluence at summer (Apr - Oct) / winter (Nov -Mar) loss rate of 0.50% / 0 25% per mile <br />10. Equal to (7) + (8) +(9) <br />11. Equal to (3) + (6) + (10) Negative values ( -) represent net depletions to river system. Positive values ( +) represent net accretions to river system. <br />