Laserfiche WebLink
Jan -15 <br />20% <br />U) <br />0.00 <br />1 00 <br />000 <br />-002 <br />-002 <br />-010 <br />000 <br />000 <br />W Cr <br />Feb -15 <br />13% <br />0.00 <br />1.00 <br />-011 <br />-0.11 <br />-001 <br />-0.12 <br />Z <br />000 <br />000 <br />-014 <br />Mar -15 <br />5.1% <br />000 <br />1 00 <br />7 <br />-015 <br />-005 <br />-020 <br />-020 <br />000 <br />000 <br />-020 <br />Apr-1 5 <br />9 4 % <br />NZO <br />0.00 <br />1 00 <br />-026 <br />-026 <br />-009 <br />-035 <br />-031 <br />000 <br />000 <br />-0 31 <br />TWO <br />9.6% <br />000 <br />1 00 <br />-031 <br />-0.31 <br />-0.10 <br />-040 <br />-037 <br />0.00 <br />000 <br />-037 <br />Jun -15 <br />105% <br />000 <br />1.00 <br />w ¢ <br />-044 <br />Table 13 <br />-055 <br />-0.47 <br />0.00 <br />000 <br />-047 <br />Jul -15 <br />99% <br />0.00 <br />1.00 <br />-048 <br />-0.48 <br />-010 <br />-058 <br />-0.53 <br />0.00 <br />000 <br />U3 <br />Aug-1 5 <br />103% <br />Star Water Resource (DMG Permit No. M -77 -522) <br />000 <br />1 00 <br />-043 <br />Person Responsible for this plan <br />-010 <br />-054 <br />-052 <br />000 <br />January 2014 to December 2015 SWSP Accounting <br />-052 <br />Sep-115 <br />15.7% <br />Lynn <br />Mayer Shults <br />000 <br />1.00 <br />-030 <br />-030 <br />-016 <br />(all values in acre -feet, unless otherwise noted) <br />-0.47 <br />000 <br />000 <br />-047 <br />Oct -15 <br />303 286.2247 <br />000 <br />(1) <br />(2) (3) (4) (5) (6) (7) <br />(8) <br />(9) <br />(10) <br />(11) <br />(12) <br />(13) <br />(14) <br />Nov -15 <br />10.6% <br />DEPLETIONS <br />000 <br />1 00 <br />-012 <br />-012 <br />-0.11 <br />-022 <br />-028 <br />000 <br />000 <br />-0.28 <br />Dec -15 <br />MINING DEPLETIONS <br />000 <br />DEWATERING <br />000 <br />-003 <br />-003 <br />-0.13 <br />Aggregate Production <br />Evaporation <br />-013 <br />TOTAL 2015 <br />Total Depletions <br />0 <br />gpm <br />0 <br />NET <br />Percent of <br />Total Excavated <br />Material <br />Material Not <br />Water <br />Exposed Area <br />Net Evap <br />0.00 <br />Not <br />Not <br />Month <br />Dust <br />Control <br />DEPLETIONS <br />Excavated <br />Material (tons) <br />Washed (tons) <br />Washed (tons) <br />Consumed <br />(ac) <br />Rate (ft) <br />Total Evap <br />Lagged <br />Lagged <br />Lagged <br />Lagged <br />Material <br />Jan -14 <br />20% <br />000 <br />000 <br />-0.02 <br />-002 <br />-146 <br />000 <br />000 <br />-1 46 <br />Feb -14 <br />1.3% <br />000 <br />-011 <br />-0.01 <br />-001 <br />-1.05 <br />1 000 <br />000 <br />1 <br />-1 05 <br />Mar -14 <br />51% <br />0 00 <br />-0 15 <br />-005 <br />-0.05 <br />-079 <br />000 <br />000 <br />-079 <br />Apr-14 <br />94% <br />000 <br />-026 <br />-009 <br />-009 <br />-061 <br />0.00 <br />000 <br />-061 <br />May-14 <br />96% <br />000 <br />-031 <br />-010 <br />-010 <br />-047 <br />000 <br />0.00 <br />-047 <br />Jun -14 <br />105% <br />000 <br />1 00 <br />-0.44 <br />-0.44 <br />-011 <br />-0.55 <br />-067 <br />0.00 <br />000 <br />-067 <br />Jul -14 <br />99% <br />000 <br />1 00 <br />-048 <br />-048 <br />-010 <br />-058 <br />-0.69 <br />000 <br />000 <br />-069 <br />Aug-14 <br />103% <br />000 <br />1 00 <br />-043 <br />-0.43 <br />-010 <br />-054 <br />-064 <br />000 <br />000 <br />-064 <br />Sep-14 <br />157% <br />000 <br />1 00 <br />-0.30 <br />-030 <br />-0.16 <br />1 -046 <br />-0.55 <br />0.00 <br />000 <br />-055 <br />Oct -14 <br />122% <br />000 <br />1 00 <br />-022 <br />-022 <br />-0.12 <br />-0.34 <br />-044 <br />000 <br />0.00 <br />-044 <br />Nov -14 <br />10.6% <br />0,00 <br />1 00 <br />-012 <br />-012 <br />-011 <br />-0.22 <br />-033 <br />0.00 <br />000 <br />-033 <br />Dec -14 <br />34% <br />000 <br />1 00 <br />000 <br />-003 <br />-0 0 <br />-012 <br />000 <br />000 <br />-016 <br />TOTAL 2014 <br />1000% <br />0 <br />0 <br />0 <br />000 <br />-282 <br />-1 99 <br />-1.00 <br />-2929 <br />-7 86 <br />000 <br />0.00 <br />-786 <br />Jan -15 <br />20% <br />0.00 <br />1 00 <br />000 <br />-002 <br />-002 <br />-010 <br />000 <br />000 <br />-010 <br />Feb -15 <br />13% <br />0.00 <br />1.00 <br />-011 <br />-0.11 <br />-001 <br />-0.12 <br />-0.14 <br />000 <br />000 <br />-014 <br />Mar -15 <br />5.1% <br />000 <br />1 00 <br />-015 <br />-015 <br />-005 <br />-020 <br />-020 <br />000 <br />000 <br />-020 <br />Apr-1 5 <br />9 4 % <br />0.00 <br />1 00 <br />-026 <br />-026 <br />-009 <br />-035 <br />-031 <br />000 <br />000 <br />-0 31 <br />May- 5 <br />9.6% <br />000 <br />1 00 <br />-031 <br />-0.31 <br />-0.10 <br />-040 <br />-037 <br />0.00 <br />000 <br />-037 <br />Jun -15 <br />105% <br />000 <br />1.00 <br />-044 <br />-044 <br />-011 <br />-055 <br />-0.47 <br />0.00 <br />000 <br />-047 <br />Jul -15 <br />99% <br />0.00 <br />1.00 <br />-048 <br />-0.48 <br />-010 <br />-058 <br />-0.53 <br />0.00 <br />000 <br />-053 <br />Aug-1 5 <br />103% <br />000 <br />1 00 <br />-043 <br />-043 <br />-010 <br />-054 <br />-052 <br />000 <br />000 <br />-052 <br />Sep-115 <br />15.7% <br />000 <br />1.00 <br />-030 <br />-030 <br />-016 <br />-0.46 <br />-0.47 <br />000 <br />000 <br />-047 <br />Oct -15 <br />122% <br />000 <br />100 <br />-022 <br />-022 <br />-012 <br />-034 <br />-038 <br />000 <br />0.00 <br />-038 <br />Nov -15 <br />10.6% <br />000 <br />1 00 <br />-012 <br />-012 <br />-0.11 <br />-022 <br />-028 <br />000 <br />000 <br />-0.28 <br />Dec -15 <br />34% <br />000 <br />1.00 <br />000 <br />-003 <br />-003 <br />-0.13 <br />0.00 <br />000 <br />-013 <br />TOTAL 2015 <br />1000% <br />1 0 <br />0 <br />0 <br />1 000 <br />-282 <br />-282 <br />-100 <br />-382 <br />-3.90 <br />0.00 <br />0.00 <br />-3.90 <br />Notes <br />1 Percent of excavated material based on historical operations at permit area. - Accounting values based on measurements of actual tonnage <br />2 Total excavated material of 0 tons in 2014 and 0 tons in 2015, distributed per (1) <br />3 and 4 Projected tons of material washed and not washed based on historical operations at permit area Actual recorded values to be used in SWSP accounting <br />5 Equal to 4% of washed material (3) + 2% of material not washed (4) <br />6 Exposed surface area outside of lined areas <br />7 Net evaporation based on gross evaporation (NOAA NWS -33) less 70% of average precipitation (see Table 16) Set to zero for months with average mean temperature less than 32 degrees <br />8 Equal to (6)' (7), Accounting values based on measurements of actual ice cover. <br />9. 1 ac -ft in 2014 and 1 ac -ft in 2015 Distributed based on (1) <br />10. Equal to (5) + (8) + (9) <br />11 Equal to unlagged mining depletions (10), lagged back to Cache la Poudre River using AWAS program with following aquifer parameters X =558 ft, W =4300 ft; T= 120000 gpd /ft, and S =O 2 Includes lagged <br />depletions from mining operations approved in previous Feit Pit SWSPs. <br />12 Based on estimated pumping of 0 gpm, on average, recorded at site <br />13 Equal to unlagged dewatering pumping (12), lagged back to Cache la Poudre River using AWAS program with following aquifer parameters X =558 ft, W =4300 ft, T= 120000 gpd /ft, and S =0 2 <br />14 Equal to (11) + (12) + (13) Negative values ( -) represent net depletions to river system Positive values ( +) represent net accretions to river system <br />wkbook [ \Pxsonswxm \LGFVxISI \SWSP das \W fv�eisl P�tSUnxnxy201� 3415 Sw5 e�ues11013111) <br />Wn4M1ee1 Stx Il/3G/2o13 9 0! �M <br />