Laserfiche WebLink
-4- <br />12. Primary future (Post- minine) land use (check one): <br />Cropland(CR) Pastureland(PL) F� General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) `� Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial /Commercial(IC) <br />Developed Water Resources(WR) Solid Waste Disposal(WD) <br />13. Primary present land use (check one): <br />1- Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial /Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />The primary equipment for mining will be a front -end loader with trucks. A dozer or scraper could be employed at some point. <br />M <br />16 <br />On Site Processinjj: F] Crushing /Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />N/A <br />Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />The current mine site is 40.0 acres. The actual footprint for mining is not changing. The <br />amendment to include the entire eighty acres will remove any question of whether mining is <br />e t>�r. g outside the pit boundaries. <br />