Laserfiche WebLink
Water Information <br />The Revenue Mine surface water control structures around the Atlas waste pile have been <br />revised to reflect the new pile configuration. Additionally, Sediment Pond 1 has been redesigned <br />to accommodate its new location and smaller drainage area. The revised Appendix 6 contains all <br />of these new designs, along with the unchanged designs for the rest of the mine. <br />Ditches Collection #1, 2, Diversion #1, and #1B have been revised due to the changes in the <br />Atlas waste pile area. Appendix 6 shows <br />DRMS Bond Calculation <br />The reduction in the size of the Atlas Waste pile will not lead to a change in the worst case <br />reclamation scenario. The worst case scenario will still be at the point that the Revenue waste <br />pile has been recently regarded, which is the time of greatest area requiring topsoil. Therefore, <br />the bond does not need to be recalculated. <br />