Laserfiche WebLink
amecO <br />Earth 8 Environmental <br />more above the geomembrane and a plate compactor was used to compact the remaining portion of <br />the slope. <br />H) Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of SLF material continued this week. A CAT D -8 dozer, a CAT 320 excavator, a <br />CAT 966 front -end loader, and tandem -axel haul trucks were used to excavate, haul, and <br />process the material. <br />Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />E Cresson Clay Processing <br />6,863 <br />125,288 <br />S Cresson Clay Processing <br />0 <br />201,199 <br />Processing in area complete. <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area co m lete. <br />Total <br />6,863 <br />357,692 <br />2) Low Volume Solution Collection Fill Material (LVSCF) <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D -10 dozer and a skid steer loader were used to process the material. <br />Location <br />This Week <br />Cumulative <br />Comments <br />(tons) <br />(tons) <br />Dump 4 LVSCF Processing <br />10,976 <br />344,865 <br />I) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />No work was performed during the week. <br />B) Mine Shaft /Stope Remediation <br />No work was performed during the week. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />VLF Weekly Report WE 05.29.10.1) <br />