My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REPORT - M1980244 (26)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-08-26_REPORT - M1980244 (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:42 PM
Creation date
2/27/2014 4:54:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/26/2011
Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 3 of 3 DOCUMENT 1 of 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Field Samples <br />1. Geomembrane sampling and testing shall be conducted in accordance with the project <br />SPECIFICATIONS for the following: <br />a. trial seam testing (Article 3.07 of this Section) <br />b. destructive seam testing (Article 3.09 of this Section) <br />2. CONTRACTOR shall maintain on -site a minimum of one spare operable tensiometer and <br />provide documentation indicating that all tensiometers used at the project were calibrated <br />within 60 days prior to the tensiometer arriving on -site for testing field samples. <br />E. In order to prevent wind - damaged geomembranes from being placed, the following Quality <br />Assurance procedures shall be followed: <br />1. CONTRACTOR shall perform its Work and utilize sufficient ballast as necessary to <br />prevent wind uplift of the geomembrane panels. <br />2. If wind damage should occur, CERTIFYING ENGINEER shall determine if the <br />geomembrane shall be repaired or replaced. Wind damage to the geomembrane will include <br />wrinkles, creases, and tears, as determined by CERTIFYING ENGINEER. <br />3. Repair or replacement of the wind - damaged geomembrane shall be completed by <br />CONTRACTOR at no additional cost to CC &V. <br />4. As determined by MANAGER and CERTIFYING ENGINEER, the geomembrane panel <br />may be rejected at no cost to CC &V. <br />1.04 DELIVERY, STORAGE, AND HANDLING <br />A. Packing and Shipping <br />1. Labels on each roll delivered to Site shall identify the following. <br />a. MANUFACTURER's name <br />b. Product Identification <br />C. Thickness <br />d. Roll number <br />e. Batch or lot number <br />f. Panel number (when applicable) <br />g. Roll dimensions <br />2. CONTRACTOR shall ensure that geomembrane rolls are properly loaded and secured to <br />prevent damage during transit. <br />Section 02776 Page 5 of 22 September 3, 2008 <br />Geomembrane Revision 1 <br />CA AMEC_CC &V\Phase 5 VLF\PSSA Cert ReportWppendicesWppendix E \SPECS \02776A.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.