My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REPORT - M1980244 (26)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-08-26_REPORT - M1980244 (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:42 PM
Creation date
2/27/2014 4:54:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/26/2011
Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 3 of 3 DOCUMENT 1 of 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TM <br />11. Certification that extrudate to be used is composed of the same resin as the geomembrane to <br />be used. <br />C. Submittals By CONTRACTOR to MANAGER during the course of the work. <br />Daily reports detailing arrival and departure times, the personnel present on -site, the <br />progress of the Work, the arrival of materials, daily square footage deployed and seamed, <br />daily square footage of geomembrane approved by the CQA Monitor and any problems <br />encountered. <br />2. Subgrade surface acceptance certificates for each area to be covered by the lining system, <br />signed by CONTRACTOR. <br />D. Without limiting the provisions of the Contract, the CONTRACTOR shall warrant the Work to <br />MANAGER in accordance with the following: <br />1. The geomembrane supplied is suitable for the environmental conditions at the site and the <br />service conditions as described in this SPECIFICATION. <br />2. The geomembrane supplied meets or exceeds all published SPECIFICATIONS as <br />referenced by the SPECIFICATION. <br />3. The geomembrane are free of defects in materials and workmanship. <br />4. The CONTRACTOR shall repair or replace all defects in the material detected on -site, <br />including uncovering and recovering the work, in compliance with the SPECIFICATIONS <br />at no additional cost to CC &V. <br />5. The CONTRACTOR shall repair any detected leaks in any seams (Manufactured or field <br />joined), including uncovering and recovering the work, in compliance with the <br />SPECIFICATIONS at no additional cost to CC &V. <br />1.03 QUALITY ASSURANCE <br />A. Manufacturing Qualifications <br />The MANUFACTURER(s) shall have experience in the manufacture of the type of <br />geomembrane that is being installed at the Cresson Project totaling at least five completed <br />facilities totaling a minimum of 5,000,000 square feet between all five facilities. <br />2. The MANUFACTURER shall provide sufficient production and qualified personnel to meet <br />the demands of the work and shall have an internal quality control program for its product. <br />3. The MANUFACTURER shall permit MANAGER, DESIGN ENGINEER, and/or <br />CERTIFYING ENGINEER or their authorized representative to visit the manufacturing <br />plant. <br />B. Geomembrane Installation Qualifications (INSTALLER) <br />INSTALLER shall be the MANUFACTURER or an approved CONTRACTOR trained <br />and licensed to install the MANUFACTURER's geomembrane. <br />Section 02776 Page 3 of 22 September 3, 2008 <br />Geomembrane Revision 1 <br />C: AMEC_CC &V\Phase 5 VLFPSSA Cert Report\Appendices\Appendix E \SPECS \02776A.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.