My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REPORT - M1980244 (26)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-08-26_REPORT - M1980244 (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:42 PM
Creation date
2/27/2014 4:54:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/26/2011
Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 3 of 3 DOCUMENT 1 of 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec-' <br />SECTION 02776.0 GEOMEMBRANE <br />PART 1: GENERAL <br />1.01 SUMMARY <br />This SPECIFICATION describes requirements for the manufacture, fabrication (if needed), supply, and <br />installation of polyethylene geomembrane for lining of the valley leach facility, as shown on the DRAWINGS; <br />and construction quality control monitoring and testing. All procedures, operations, and methods shall be in <br />strict compliance with the SPECIFICATIONS, Construction Quality Assurance Plan, and the DRAWINGS. <br />1.02 SUBMITTALS <br />A. CONTRACTOR shall provide the following information relating to the geomembrane <br />MANUFACTURER and INSTALLER with its proposal. <br />1. Information from the MANUFACTURER including company name, address, telephone <br />number, the names of the company president and quality control manager, and narrative of <br />the company history. <br />2. Information from the MANUFACTURER on factory size, equipment, personnel, number of <br />shifts per day, and capacity per shift. <br />3. Quality Control Manuals from the MANUFACTURER and INSTALLER for the <br />installation and testing of the geomembrane, including trial seams, seaming, nondestructive <br />testing, destructive testing procedures, repair procedures and in -field quality control forms. <br />Upon review of the Quality Control Manuals, MANAGER may request additional testing <br />during the manufacturing process at no additional cost to CC &V. <br />4. A list of at least five completed facilities from the MANUFACTURER totaling a minimum <br />of 5 million (5,000,000) square feet between all five facilities of the type of geomembrane <br />that is being installed at the Cresson Project. Each entry in this list should specify the name <br />and purpose of the facility, its location and date of installation, the name of the owner, the <br />project manager, designer, fabricator (if any), and the geosynthetics installation contractor <br />and the name and telephone number of the contact at the facility who can discuss the project. <br />In addition, the geomembrane thickness and total square footage of the installation surface <br />should be included. <br />Installation capabilities of the INSTALLER. <br />6. Information on equipment and personnel from the INSTALLER. <br />A list of at least five completed facilities, totaling five million (5,000,000) square feet for <br />which INSTALLER has installed the type of geomembrane that is being installed at the <br />Cresson Project. For each installation, the following information shall be provided: <br />a. Name and purpose of facility, its location, and date of installation. <br />b. Name of owner, Design Engineer, MANUFACTURER, Fabricator, if applicable, <br />and name and telephone number of contact at the facility who can discuss the <br />project. <br />Section 02776 Page 1 of 22 September 3, 2008 <br />Geomembrane Revision 1 <br />C: AMEC_CC &V\Phase 5 VLF \PSSA Cert Report Appendices\Appendix E \SPECS \02776.r1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.