My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REPORT - M1980244 (26)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-08-26_REPORT - M1980244 (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:42 PM
Creation date
2/27/2014 4:54:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
8/26/2011
Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 3 of 3 DOCUMENT 1 of 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIITTA" <br />SOIL CONSTRUCTION TESTING FREQUENCY <br />VOLUME PER TEST' <br />1. Tests shall be performed at the specified frequency or one per material type, whichever is greater. <br />2. Use the USCS for description and identification (ASTM D2488). <br />3. In -place Moisture Content. <br />4. If the permeability of Soil Liner Fill is higher than 9.0x10 -7 cm/sec, an additional permeability test will be <br />performed on a sample located within a 10 foot radius of the sample in question. If the permeability of the <br />Soil Liner Fill is higher than 1.0x10 -6 cm/sec, 4 additional samples will be obtained from with 135,000 <br />square foot area centered about the failing test. This testing sequence will be repeated if additional failing <br />permeability tests are measured. <br />* ** END OF SECTION * ** <br />Section 01400.1 Page 9 of 9 September 3, 2008 <br />Earthworks CQA Plan Revision 1 <br />PAPhase 5 OSA 2011 Cert Report\Appendices\Appendix E Specifications\01400.1.r1.doc <br />Low Volume Solution Collection Fill, Bedding <br />Test and <br />Fill, Leak Detection Fill, <br />Soil Liner <br />Drain Cover <br />ASTM <br />and Pipe Bedding Fill <br />Fill <br />Fill <br />Designation <br />c <br />c <br />c <br />Compaction <br />-- <br />5,000 <br />-- <br />ASTM D698 <br />Particle Size <br />10,000 <br />5,000 <br />20,000 <br />(ASTM C117, C136, <br />D1140 <br />Atterberg Limit <br />10,000 <br />5,000 <br />20,000 <br />(ASTM D4318) <br />Moisture Content <br />10,000 <br />500 <br />20,000 <br />(ASTM 132216) <br />Permeability4 <br />-- <br />4,000 <br />-- <br />ASTM D5084/2434 <br />Nuclear Density <br />-- <br />500 <br />-- <br />1. Tests shall be performed at the specified frequency or one per material type, whichever is greater. <br />2. Use the USCS for description and identification (ASTM D2488). <br />3. In -place Moisture Content. <br />4. If the permeability of Soil Liner Fill is higher than 9.0x10 -7 cm/sec, an additional permeability test will be <br />performed on a sample located within a 10 foot radius of the sample in question. If the permeability of the <br />Soil Liner Fill is higher than 1.0x10 -6 cm/sec, 4 additional samples will be obtained from with 135,000 <br />square foot area centered about the failing test. This testing sequence will be repeated if additional failing <br />permeability tests are measured. <br />* ** END OF SECTION * ** <br />Section 01400.1 Page 9 of 9 September 3, 2008 <br />Earthworks CQA Plan Revision 1 <br />PAPhase 5 OSA 2011 Cert Report\Appendices\Appendix E Specifications\01400.1.r1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.