My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REPORT - M1980244 (16)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-08-26_REPORT - M1980244 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:41 PM
Creation date
2/27/2014 2:52:55 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
8/26/2011
Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 1 of 3 map: Hi Volume Sol Collect sys
From
CC&V
To
DRMS
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />z <br />w <br />x <br />w <br />J <br />U <br />U) <br />0 <br />O <br />J <br />END CAP <br />(NOTE 1) <br />FLOV <br />L <br />1J,J 1 I IL SECONDARY SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />TYPICAL SINGLE TERTIARY TO SECONDARY <br />SOLUTION COLLECTION PIPE JUNC'T'ION <br />NTS <br />o� <br />o� <br />CPe SOLUTION COLLECTION PIPE CPe SOLUTION COLLECTION PIPE F`o� <br />(SIZE SHOWN ON DRAWING NO. A400) (SIZE SHOWN ON DRAWING NO. A400) C^ <br />CPe (TYPE SP) SECONDARY <br />SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />CPe (TYPE SP) SECONDARY <br />SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />�JMIMIIIIIIIIIIIIIillllllllIII�I�III1� <br />ADS N -12 OR EQUIVALENT REDUCER <br />(PIPE SIZES SHOWN ON DRAWING NO. A400) <br />2 TYPICAL SOLUTION COLLECTION PIPE REDUCER DETAIL <br />A400 NTS <br />EN <br />(N( <br />26" DIA. DR <br />PRIMARY <br />1! L JLL VLI/lIL VtJ <br />LP I1 v 11L <br />TYPICAL TERTIARY OR SECONDARY TO PRIMARY <br />5 SOLUTION COLLECTION PIPE CONNECTION <br />400 ) NTS <br />FLOW <br />o� <br />2' MINIMUM DRAIN <br />COVER FILL <br />1' MINIMUM SOIL <br />LINER FILL <br />CPe SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING A400 <br />FLOW <br />'1 <br />TEE (PIPE SIZES SHOWN <br />ON DRAWING NO. A400) <br />ALTERNATIVE SOLUTION COLLECTION PIPE TEE JUNCTION <br />NTS <br />FLOW <br />WYE (PIPE SIZES SHOWN <br />ON DRAWING NO. A400) <br />CPe (TYPE SP) SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />FLOW <br />0 <br />1, <br />END CAP <br />(NOTE 1) <br />FLOW <br />ALTERNATIVE SOLUTION COLLECTION PIPE WYE JUNCTION <br />5' <br />NTS <br />CPe COLLECTION PIPE <br />•1 <br />PRIMARY SOLUTION COLLECTION PIPE <br />90' CENTERS (T - <br />4" DIA. CPe <br />HIGHWAY GRAD <br />TERTIARY SOLUTI <br />COLLECTION PIF <br />80 mil SINGLE <br />SIDED TEXTURE <br />(TEXTURE FACE D( <br />LLDPE GEOMEMBF <br />PREPARED FOUND) <br />111- <br />FOR SOIL <br />LINER FILL <br />NTS <br />A VLF LINER SYSTEM <br />A4OO NTS <br />■ <br />0 <br />,1 <br />TYPICAL DOUBLE TERTIARY TO SECONDARY <br />SOLUTION COLLECTION PIPE JUNCTION <br />DRILL 8— HALF —INCH DIA. <br />HOLES EQUALLY SPACED <br />AROUND PERIMETER <br />45' (TYP.) <br />PRIMARY SOLUTION COLLECTION <br />PIPE PERFORATION DETAIL <br />NTS <br />NTS <br />NOTES: <br />1. ALL CPe PIPES TO TERMINATE <br />WITH MANUFACTURED END CAP. <br />CPe (TYPE SP) SECONDARY SOLUTION <br />B <br />— <br />COLLECTION PIPE <br />A410 <br />26" DIA. DR 11 HDPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />PERFORATIONS <br />FLOW <br />FLOW <br />�— <br />0 0 <br />No 0 0 <br />0 0 0 <br />O O <br />O o O <br />o O 0 FLOW <br />`- <br />0 0 <br />0 0 O <br />0 0 0 <br />END CAP <br />(NOTE 1) PLASTIC TIE <br />0 0 <br />0 0 <br />0 <br />0 0 0 <br />4" DIA. CPe TERTIARY <br />COLLECTION PIPE <br />12" PERFORATION <br />ROW SPACING <br />•1 <br />PRIMARY SOLUTION COLLECTION PIPE <br />90' CENTERS (T - <br />4" DIA. CPe <br />HIGHWAY GRAD <br />TERTIARY SOLUTI <br />COLLECTION PIF <br />80 mil SINGLE <br />SIDED TEXTURE <br />(TEXTURE FACE D( <br />LLDPE GEOMEMBF <br />PREPARED FOUND) <br />111- <br />FOR SOIL <br />LINER FILL <br />NTS <br />A VLF LINER SYSTEM <br />A4OO NTS <br />■ <br />0 <br />,1 <br />TYPICAL DOUBLE TERTIARY TO SECONDARY <br />SOLUTION COLLECTION PIPE JUNCTION <br />DRILL 8— HALF —INCH DIA. <br />HOLES EQUALLY SPACED <br />AROUND PERIMETER <br />45' (TYP.) <br />PRIMARY SOLUTION COLLECTION <br />PIPE PERFORATION DETAIL <br />NTS <br />NTS <br />NOTES: <br />1. ALL CPe PIPES TO TERMINATE <br />WITH MANUFACTURED END CAP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.