Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />2011 Phase 5 VLF OSA 2nd Portion <br />February 2009 CQA Field Staff Schedule for AMEC Personnel <br />ameO <br />Name <br />2/1 <br />2/2 <br />213 <br />2/4 <br />2/5 <br />2/6 <br />2/7 <br />2/8 <br />2/9 <br />2/10 <br />2/11 <br />2/12 <br />2/13 <br />2/14 <br />2/15 <br />2/16 <br />2/17 <br />2/18 <br />2/19 <br />2/20 <br />2/21 <br />2/22 <br />2/23 <br />2/24 <br />2/25 <br />2/26 <br />2127 <br />2/28 <br />Joe Hickey <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />- <br />Steve Rice <br />PR <br />PR <br />PR <br />PR <br />PR <br />Alfonso Frias <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />Garry Salisbury <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Joe Namlick <br />PR <br />I PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />John Lupo <br />PCE <br />Derek Wittwer <br />PM <br />PM <br />I PM <br />I PM <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/ Laboratory Manager <br />SE = Senior Engineer <br />Par f 1 <br />