Laserfiche WebLink
O <br />O <br />k <br />X <br />Li <br />86�,p0 <br />g4�pO <br />r <br />A, <br />k <br />O <br />O <br />co <br />M <br />• <br />CUEN7 CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />Tint <br />PHASE 5 LOW VOLUME SOLUTION <br />COLLECTION FILL (LVSCF) PLACEMENT <br />DESIGNED BY CMT CHECKED BY JDH DATE <br />an*& DRAWN BY CMT APPROVED BY JDH 10/02/10 <br />EARTH AND ENVIRONMENTAL CADO nUNAME FIGURE No. REV <br />__ - 5 0 <br />LEGEND: <br />h/ <br />EXISTING GROUND SURFACE CONTOUR AND EL. FEET <br />PROPOSED GROUND SURFACE CONTOUR EL. FEET <br />/hr• <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />I / <br />® LVSCF PLACEMENT <br />PREVIOUS LVSCF PLACEMENT <br />l rl/ <br />CUEN7 CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />Tint <br />PHASE 5 LOW VOLUME SOLUTION <br />COLLECTION FILL (LVSCF) PLACEMENT <br />DESIGNED BY CMT CHECKED BY JDH DATE <br />an*& DRAWN BY CMT APPROVED BY JDH 10/02/10 <br />EARTH AND ENVIRONMENTAL CADO nUNAME FIGURE No. REV <br />__ - 5 0 <br />