Laserfiche WebLink
Xoo 00 <br />+ NOTES: <br />N <br />_ APPROXIMATELY 237,782 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />O APPROXIMATELY 2,965,430 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />x <br />X <br />mU <br />1; 510 <br />O/ <br />(O <br />= c <br />c <br />co <br />O <br />O <br />i Off% <br />x;, <br />i CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />x PHASE 5 VLF <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA PRIMARY 100 MIL <br />DESIGNED BY CUT CHECKED BY JON DATE <br />aneco r BY CMT APPROVED BY JDH 09/25/ <br />EARTH AND ENVIRONMENTAL CADO F"NO ME fM.URE No. REV <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, r«i <br />O <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />D <br />EXISTING UNIMPROVED ROAD/TRNLS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />_� <br />2 <br />PREVIOUSLY DEPLOYED LINER <br />�i DEPLOYED LINER <br />+ NOTES: <br />N <br />_ APPROXIMATELY 237,782 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />O APPROXIMATELY 2,965,430 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />x <br />X <br />mU <br />1; 510 <br />O/ <br />(O <br />= c <br />c <br />co <br />O <br />O <br />i Off% <br />x;, <br />i CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />x PHASE 5 VLF <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA PRIMARY 100 MIL <br />DESIGNED BY CUT CHECKED BY JON DATE <br />aneco r BY CMT APPROVED BY JDH 09/25/ <br />EARTH AND ENVIRONMENTAL CADO F"NO ME fM.URE No. REV <br />