My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REPORT - M1980244 (25)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-08-26_REPORT - M1980244 (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:42 PM
Creation date
2/27/2014 10:14:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
8/26/2011
Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 2 of 3 DOCUMENT 3 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Xoo 00 <br />+ NOTES: <br />N <br />_ APPROXIMATELY 237,782 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />O APPROXIMATELY 2,965,430 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />x <br />X <br />mU <br />1; 510 <br />O/ <br />(O <br />= c <br />c <br />co <br />O <br />O <br />i Off% <br />x;, <br />i CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />x PHASE 5 VLF <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA PRIMARY 100 MIL <br />DESIGNED BY CUT CHECKED BY JON DATE <br />aneco r BY CMT APPROVED BY JDH 09/25/ <br />EARTH AND ENVIRONMENTAL CADO F"NO ME fM.URE No. REV <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, r«i <br />O <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />D <br />EXISTING UNIMPROVED ROAD/TRNLS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />_� <br />2 <br />PREVIOUSLY DEPLOYED LINER <br />�i DEPLOYED LINER <br />+ NOTES: <br />N <br />_ APPROXIMATELY 237,782 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />O APPROXIMATELY 2,965,430 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />x <br />X <br />mU <br />1; 510 <br />O/ <br />(O <br />= c <br />c <br />co <br />O <br />O <br />i Off% <br />x;, <br />i CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />x PHASE 5 VLF <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA PRIMARY 100 MIL <br />DESIGNED BY CUT CHECKED BY JON DATE <br />aneco r BY CMT APPROVED BY JDH 09/25/ <br />EARTH AND ENVIRONMENTAL CADO F"NO ME fM.URE No. REV <br />
The URL can be used to link to this page
Your browser does not support the video tag.