My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REPORT - M1980244 (25)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-08-26_REPORT - M1980244 (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:42 PM
Creation date
2/27/2014 10:14:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
8/26/2011
Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 2 of 3 DOCUMENT 3 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />inventoried the geomembrane and was present at all times during unloading of the <br />geomembrane. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed structural fill placement within the Phase 5 VLF fill area. <br />AMEC inspected and approved subgrade prior to geomembrane deployment. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed and inspected anchor trench backfill. <br />AMEC observed the installation of the low volume solution collection system. <br />AMEC constantly monitored the LVSCF placement. Samples were also obtained of placed LVSCF <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the DCF Process area. <br />AMEC continuously monitored the DCF placement. <br />AMEC observed the installation of the high volume solution collection system. <br />AMEC observed and inventoried geomembrane delivered to site. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />GENERAL PROJECT ITEMS <br />Summary of Concerns: <br />No concerns <br />Summary of Planning Items: <br />Continue structural fill placement within the Phase 5 VLF. <br />Continue geomembrane installation within the Phase 5 VLF footprint. <br />Continue installation of the low volume solution collection system. <br />Continue installation of the high volume solution collection system. <br />Continue LVSCF placement. <br />Continue DCF placement. <br />VLF Weekly Report WE 09.18.10.13 <br />