Laserfiche WebLink
ameO <br />ATTACHMENT A <br />2010 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name <br />AUG 29 <br />AUG 30 <br />AUG 31 <br />SEP 1 <br />SEP 2 <br />SEP 3 <br />SEP 4 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />- <br />Steve Rice <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />- <br />Ben'amin Melly <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />- <br />Craig Thompson <br />- <br />GT <br />GT <br />GT <br />GT <br />GT <br />- <br />Kerry Law <br />GT <br />GT <br />GT <br />GT <br />GT <br />- <br />- <br />Eric Nargang <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />- <br />Jeremy Laub <br />- <br />GT <br />GT <br />GT <br />GT <br />- <br />- <br />Bill Erickson <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />Uwe Kelley <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />Reggie Long <br />ST <br />- <br />- <br />- <br />- <br />- <br />Amanda Dolezal <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />Jennifer Markham <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />- <br />Dave Hosely <br />- <br />- <br />ST <br />ST <br />ST <br />ST <br />- <br />Madison Crouch <br />- <br />LT <br />LT <br />LT <br />LT <br />LT <br />- <br />John Lupo <br />- <br />PCE <br />- <br />PCE <br />- <br />- <br />- <br />Derek Wittwer <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Jay Moore <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />LEGEND <br />PS = <br />Project Sponsor <br />PCE <br />= Project Certifying Engineer <br />PM = <br />Project Manager <br />PR = <br />Project Resident <br />LS = <br />Lead Soils Engineer <br />LG = <br />Lead Geosynthetics Engineer <br />ST = <br />Soil Technician <br />LT = <br />Laboratory Technician <br />GT = <br />Geosynthetics Technician <br />FLM= <br />Field/Laboratory Manager <br />SE = <br />Senior Engineer <br />VLF Weekly Report WE 09.04.10.D <br />