My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REPORT - M1980244 (25)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-08-26_REPORT - M1980244 (25)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:42 PM
Creation date
2/27/2014 10:14:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
8/26/2011
Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 2 of 3 DOCUMENT 3 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LEGEND: <br />- <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />O <br />- - - -... <br />+ <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />C3 - - <br />la <br />+ <br />+ <br />W ! <br />EXISTING UNIMPROVED ROAD/TRAILS <br />c0 <br />EXISTING IMPROVED ROADWAYS <br />C7 <br />EXISTING DRAINAGES <br />p <br />Qi <br />PREVIOUSLY DEPLOYED LINER <br />'A <br />co <br />DEPLOYED LINER <br />C9 <br />NOTES: <br />APPROXIMATELY 283,829 SOUARE FEET OF SECONDARY 100 MIL GEOMEMBRANE DEPLOYED <br />p0 <br />DURING WEEK <br />p <br />APPROXIMATELY 2,319,767 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />Ox <br />O <br />N <br />.clV <br />x <br />_v <br />W <br />O <br />+ <br />cly c <br />CO <br />2 <br />f <br />o <br />C-) <br />o <br />o <br />o <br />+ <br />- <br />+ <br />o <br />CV <br />_ <br />- <br />0 <br />O <br />m <br />PO <br />o <br />-` <br />o <br />o <br />+ <br />+ <br />C`4 <br />0 <br />04 <br />x; <br />/ <br />P� it <br />"'EH` CRIPPLE CREEK &VICTOR <br />032 +00 OpJ <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />- W <br />TITLE <br />q� <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />�, <br />°, ' <br />PSSA SECONDARY 100 MIL <br />� <br />i <br />DESIGNED BY <br />CMT <br />CHECKED BY <br />I JDN I <br />DATE <br />DRAWN BY <br />CMT <br />APPROVED BY <br />JDH <br />08/28/ <br />I� <br />D4+ <br />{, <br />p �� b <br />iA� <br />EARTH AND ENVIRONMENTAL <br />CAM FILENAME <br />ncuaE N,. <br />REV <br />.. p2 ±00 _� - -_- - -_ <br />- <br />3 <br />C <br />
The URL can be used to link to this page
Your browser does not support the video tag.