Laserfiche WebLink
Table 7 <br />Cripple Creek & Victor Gold Mining Company <br />2011 Phase 5 CLF OSA 2nd Portion <br />COA Laboratory Test Summary - Soil Liner Fill <br />Sample <br />No. <br />Date Tested <br />Location <br />Elev. (ft) <br />Natural <br />Moisture <br />Specification (% assin) <br />Atterberg <br />Moisture Density <br />Permeability <br />100 15 -65 <br />Plasticit Index: 10 Min <br />Maximum <br />Dens ty <br />Density <br />Optimum <br />Moisture <br />N <br />1 0E -06 cm /sec (max) <br />o <br />Grain Size Distribution (/o passing) <br />Liquid <br />Limit <br />Plastic <br />Limit <br />Plastic <br />Index <br />Permeability <br />(cm/sec) <br />2 <br />1.5 <br />0.75 <br />0.375 <br />#4 <br />#40 <br />#200 <br />Northing Eastin <br />SLF -35 -C <br />5/5/2009 <br />out resson a rocess <br />Stockpile. <br />11.6 <br />100.0 <br />96.0 <br />86.6 <br />78.5 <br />71.1 <br />52.7 <br />42.1 <br />44 <br />19 <br />25 <br />116.5 <br />13.3 <br />1.2E -08 <br />SLF -36 -C <br />5/5/2009 <br />South Cresson Clay Process <br />Stock ile <br />9.1 <br />100.0 <br />98.5 <br />85.6 <br />75.4 <br />68.9 <br />48.0 <br />37.8 <br />40 <br />17 <br />23 <br />117.3 <br />12.0 <br />2.8E -08 <br />SLF -41 -C <br />5/18/2009 <br />South Cresson Clay Process <br />Stockpile <br />11.7 <br />100.0 <br />96.0 <br />87.2 <br />73.1 <br />65.7 <br />45.6 <br />36.2 <br />40 <br />16 <br />24 <br />120.4 <br />11.8 <br />5.1 E -07 <br />SLF -49 -C <br />6/29/2009 <br />South Cresson Clay Process <br />Stockpile <br />12.5 <br />- <br />100.0 <br />92.6 <br />81.2 <br />73.1 <br />54.2 <br />43.0 <br />46 <br />16 <br />30 <br />114.4 <br />13.9 <br />6.4E -08 <br />SLF -50 -C <br />7/1/2009 <br />South Cresson Clay Process <br />Stockpile <br />14.0 <br />100.0 <br />99.6 <br />88.5 <br />81.1 <br />73.6 <br />52.3 <br />42.2 <br />46 <br />16 <br />30 <br />115.6 <br />13.5 <br />3.5E -07 <br />SLF -51 -C <br />7/1/2009 <br />South Cresson Clay Process <br />Stockpile <br />16.6 <br />100.0 <br />98.6 <br />83.8 <br />74.7 <br />68.2 <br />51.3 <br />41.3 <br />44 <br />29 <br />15 <br />117.3 <br />12.7 <br />4.2E -07 <br />SLF -54 -C <br />7/13/2009 <br />South Cresson Clay Process <br />Stockpile <br />10.1 <br />100.0 <br />98.5 <br />92.8 <br />81.4 <br />74.5 <br />55.4 <br />44.8 <br />41 <br />16 <br />25 <br />117.8 <br />12.9 <br />3.7E -08 <br />SLF -58 -C <br />7/17/2009 <br />South Cresson Clay Process <br />Stockpile <br />10.6 <br />100.0 <br />98.1 <br />85.0 <br />75.4 <br />68.7 <br />50.9 <br />41.1 <br />41 <br />16 <br />25 <br />116.6 <br />13.2 <br />3.5E -08 <br />SLF -59 -C <br />7/21/2009 <br />South Cresson Clay Process <br />Stockpile <br />13.0 <br />100.0 <br />95.7 <br />87.4 <br />80.7 <br />74.2 <br />53.3 <br />42.6 <br />38 <br />15 <br />23 <br />116.1 <br />14.2 <br />1.5E -07 <br />SLF -64 -C <br />8/18/2009 <br />South Cresson Clay Process <br />Stockpile. <br />N/T <br />100.0 <br />98.1 <br />83.9 <br />74.1 <br />67.1 <br />51.0 <br />41.1 <br />41 <br />14 <br />27 <br />118.3 <br />12.1 <br />1.6E -07 <br />SLF -65 -C <br />8/19/2009 <br />South Cresson Clay Process <br />Stock pile <br />N/T <br />100.0 <br />97.4 <br />87.9 <br />78.3 <br />70.7 <br />53.0 <br />43.1 <br />40 <br />13 <br />27 <br />119.3 <br />12.7 <br />2.5E -07 <br />SLF -69 -C <br />9/2/2009 <br />South Cresson Clay Process <br />Stock pile <br />N/T <br />100.0 <br />99.6 <br />89.9 <br />77.7 <br />68.6 <br />51.2 <br />41.7 <br />40 <br />19 <br />21 <br />115.1 <br />14.8 <br />7.9E -08 <br />SLF -70 -C <br />9/3/2009 <br />South Cresson Clay Process <br />Stock pile <br />N/T <br />100.0 <br />98.0 <br />77.3 <br />67.6 <br />61.5 <br />46.2 <br />37.7 <br />29 <br />16 <br />13 <br />119.7 <br />13.7 <br />4.9E -08 <br />SLF -75 -C <br />10/8/2009 <br />South Cresson Clay Process <br />Stockpile <br />N/T <br />100.0 <br />97.4 <br />83.0 <br />66.2 <br />59.4 <br />43.0 <br />34.9 <br />41 <br />20 <br />21 <br />121.9 <br />12.0 <br />7.3E -07 <br />SLF -81 -C <br />11/2/2009 <br />South Cresson Clay Process <br />Stockpile <br />N/T <br />- <br />100.0 <br />96.8 <br />83.8 <br />74.7 <br />56.1 <br />45.6 <br />37 <br />16 <br />21 <br />118.2 <br />14.5 <br />1.5E -07 <br />SLF -85 -C <br />11/11/2009 <br />South Cresson Clay Process <br />Stockpile <br />N/T <br />- <br />100.0 <br />94.8 <br />90.5 <br />81.3 <br />60.1 <br />47.2 <br />39 <br />19 <br />20 <br />116.4 <br />11.8 <br />1.4E -07 <br />SLF -87 -C <br />12/7/2009 <br />South Cresson Clay Process <br />Stockpile <br />N/T <br />100.0 <br />97.8 <br />89.8 <br />78.6 <br />72.7 <br />55.3 <br />42.8 <br />38 <br />20 <br />18 <br />116.7 <br />14.4 <br />4.8E -07 <br />SLF -89 -C <br />12/8/2009 <br />South Cresson Clay Process <br />Stockpile <br />N/T <br />- <br />100.0 <br />95.2 <br />84.0 <br />73.9 <br />54.1 <br />39.3 <br />43 <br />21 <br />22 <br />117.2 <br />12.4 <br />2.4E -07 <br />SLF -91 -C <br />12/8/2009 <br />South Cresson Clay Process <br />Stockpile <br />N/T <br />100.0 <br />98.7 <br />88.9 <br />75.1 <br />70.6 <br />58.8 <br />40.9 <br />44 <br />15 <br />29 <br />118.1 <br />12.9 <br />5.0E -08 <br />SLF -93 -C <br />12/11/2009 <br />South Cresson Clay Process <br />Stockpile. <br />N/T <br />- <br />100.0 <br />94.0 <br />81.9 <br />73.9 <br />56.7 <br />43.1 <br />44 <br />14 <br />30 <br />115.5 <br />15.2 <br />6.7E -08 <br />SLF -98 -C <br />1/11/2010 <br />South Cresson Clay Process <br />Stockpile <br />N/T <br />100.0 <br />97.6 <br />86.9 <br />78.7 <br />69.8 <br />50.2 <br />40.9 <br />40 <br />15 <br />25 <br />111.0 <br />12.3 <br />8.1 E -07 <br />SLF -102 -C <br />1/15/2010 <br />South Cresson Clay Process <br />Stockpile <br />N/T <br />100.0 <br />92.4 <br />78.4 <br />68.5 <br />50.5 <br />40.2 <br />37 <br />13 <br />24 <br />117.5 <br />12.0 <br />5.1 E -08 <br />SLF -104 -C <br />1/20/2010 <br />South Cresson Clay Process <br />Stockpile <br />15.4 <br />- <br />100.0 <br />94.1 <br />86.2 <br />78.8 <br />56.3 <br />44.8 <br />39 <br />13 <br />26 <br />114.9 <br />12.4 <br />5.4E -08 <br />SLF -107 -C <br />1/28/2010 <br />South Cresson Clay Process <br />Stockpile <br />8.3 <br />100.0 <br />98.6 <br />87.3 <br />78.4 <br />70.6 <br />49.0 <br />39.4 <br />42 <br />13 <br />29 <br />122.4 <br />11.0 <br />2.7E -08 <br />SLF -116 -C <br />2/15/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />12.9 <br />100.01 <br />99.2 <br />91.5 <br />1 84.0 <br />77.7 <br />57.9 <br />47.0 <br />36 <br />16 <br />20 <br />117.7 <br />12.9 <br />4.6E -08 <br />SLF -117 -C <br />2/19/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />10.7 <br />100.0 <br />98.4 <br />92.0 <br />84.3 <br />76.3 <br />55.8 <br />41.8 <br />38 <br />17 <br />21 <br />116.5 <br />14.4 <br />3.3E -07 <br />SLF -118 -C <br />2/22/2010 <br />East Cresson Clay Borrow <br />Stockpile. <br />12.8 <br />100.0 <br />98.7 <br />85.4 <br />76.3 <br />67.1 <br />43.8 <br />31.2 <br />34 <br />18 <br />16 <br />120.1 <br />12.8 <br />5.2E -08 <br />SLF -119 -C <br />2/23/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />1 12.0 <br />100.0 <br />98.9 <br />92.9 <br />84.6 <br />75.8 <br />44.9 <br />31.3 <br />29 <br />16 <br />13 <br />119.6 <br />13.4 <br />4.0E -08 <br />SLF -120 -C <br />2725/2610 <br />East Cresson Clay Borrow <br />Stockpile <br />1 13.1 <br />100.0 <br />99.5 <br />90.8 <br />79.9 <br />68.7 <br />46.0 <br />31.7 <br />30 <br />14 <br />16 <br />115.7 <br />13.4 <br />1.8E -08 <br />SLF -125 -C <br />3/5/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />15.5 <br />100.0 <br />99.3 <br />96.6 <br />87.6 <br />72.6 <br />49.9 <br />39.2 <br />35 <br />18 <br />17 <br />112.2 <br />14.4 <br />1.7E -07 <br />SLF -126 -C <br />3/8/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />15.0 <br />- <br />100.0 <br />97.7 <br />91.8 <br />83.7 <br />55.7 <br />44.4 <br />33 <br />18 <br />15 <br />117.5 <br />14.4 <br />7.0E -07 <br />SLF -130 -C <br />3/26/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />6.0 <br />100.0 <br />100.0 <br />99.8 <br />95.1 <br />84.1 <br />54.5 <br />39.8 <br />44 <br />20 <br />24 <br />114.9 <br />15.2 <br />9.3E -08 <br />SLF -133 -C <br />4/1/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />16.3 <br />- <br />100.0 <br />97.0 <br />91.8 <br />83.6 <br />57.1 <br />43.7 <br />38 <br />20 <br />18 <br />114.1 <br />15.7 <br />6.7E -08 <br />SLF -135 -C <br />4/9/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />14.7 <br />100.0 <br />98.8 <br />94.2 <br />82.9 <br />70.4 <br />46.0 <br />36.7 <br />38 <br />16 <br />22 <br />115.6 <br />14.4 <br />6.1 E -08 <br />SLF -137 -C <br />4/16/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />17.0 <br />- <br />100.0 <br />91.3 <br />82.8 <br />77.7 <br />53.6 <br />41.8 <br />40 <br />16 <br />24 <br />114.1 <br />14.6 <br />1.1 E -07 <br />SLF -141 -C <br />4/21/2010 <br />East Cresson Clay Borrow <br />Stockpile. <br />17.0 <br />- <br />100.0 <br />92.9 <br />86.7 <br />79.2 <br />64.2 <br />56.9 <br />35 <br />13 <br />22 <br />106.1 <br />16.1 <br />2.4E -08 <br />SLF -143 -C <br />5/3/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />19.4 <br />100.0 <br />99.6 <br />98.4 <br />93.6 <br />86.1 <br />63.1 <br />52.5 <br />41 <br />16 <br />25 <br />110.7 <br />15.7 <br />2.7E -07 <br />SLF -145 -C <br />5/7/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />13.9 <br />- <br />100.0 <br />97.4 <br />90.6 <br />86.3 <br />61.5 <br />42.8 <br />36 <br />16 <br />20 <br />N/T <br />N/T <br />2.0E -08 <br />SLF -149 -C <br />5/19/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />N/T <br />100.0 <br />97.4 <br />88.6 <br />85.1 <br />71.4 <br />52.9 <br />36 <br />18 <br />18 <br />117.2 <br />15.3 <br />2.1 E -07 <br />SLF -155 -C <br />6/1/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />N/T <br />1100.01 <br />96.1 <br />1 91.2 <br />88.3 <br />62.5 <br />51.3 <br />39 <br />16 <br />23 <br />115.4 <br />13.0 <br />5.1 E -07 <br />SLF -159 -C <br />6/5/2010 <br />East Cresson Clay Borrow <br />Stockpile <br />N/T <br />1 <br />1100.01 <br />92.8 <br />1 89.1 <br />88.7 <br />72.5 <br />63.6 <br />39 <br />16 <br />23 <br />115.4 <br />13.0 <br />1.3E -07 <br />1 of 2 <br />NP- Non - Plastic <br />N/T- Not Tested <br />