Laserfiche WebLink
AM '` <br />M <br />8.0 CONCLUSIONS <br />In accordance with our responsibilities as the Project Engineer and as the Quality <br />Assurance Consultant for construction of the 2011 Phase 5 VLF OSA 2nd Portion, and per <br />the requirements of the various applicable DRMS approvals, AMEC Earth and <br />Environmental Inc. (AMEC) attests that it observed and performed the required CQA <br />activities during construction of the 2011 Phase 5 VLF OSA 2nd Portion. Based on daily <br />communications with AMEC personnel, observations made during on -site visits, and review <br />of the laboratory and field test results, AMEC attests that the 2011 Phase 5 VLF OSA 2nd <br />Portion was constructed in compliance with the design plans and specifications as described <br />in this document. <br />Sincerely, <br />AMEC Earth and Environmental, Inc. <br />D. Hickey <br />Resident CQA�Supervisor <br />Jay Janney- Moore, P. E. <br />Certifying Engineer/ Project Manager <br />att�„ J <br />Kimberly Finke Morrison, P.E., R.G. <br />Project Sponsor <br />JDH /JJM /KM <br />AMEC Earth & Environmental, Inc <br />2000 S. Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www amec.com <br />W <br />