My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-26_REPORT - M1980244 (28)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-08-26_REPORT - M1980244 (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:42:42 PM
Creation date
2/27/2014 9:38:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
8/26/2011
Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 1 of 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />6.0 GEOMEMBRANE CQA TESTING AND MONITORING <br />The following sections describe the CQA activities performed by AMEC for the <br />geomembrane installed in the 2011 Phase 5 VLF OSA 2nd Portion, and the geomembrane <br />installed in the Leak Detection Trenches. <br />In accordance with the AMEC CQA Plan, when an AMEC monitor observed deficiencies, the <br />monitor determined the nature and extent of the problem and notified Lone Star and /or <br />CC &V. When unsatisfactory test results identified a deficiency, AMEC performed additional <br />tests to define the extent of the deficient area. Lone Star corrected deficiencies to meet the <br />requirements of the specifications, and AMEC retested and /or approved the corrected <br />deficiency prior to any additional related work. <br />CQA activities conducted by AMEC during the installation of the LLDPE geomembrane in <br />the 2011 Phase 5 VLF OSA 2nd Portion consisted of the following: <br />• Conformance sampling and testing of the geomembrane; <br />• Observation and approval of the SLF surface prior to deployment of 80- <br />mil single -sided textured LLDPE geomembrane; <br />• Observation and documentation of geomembrane deployment, including <br />verifying sheet thickness and overlap, and documenting panel layout; <br />• Observation of trial seam sample testing and documentation of results; <br />• Observation and documentation of field seaming; <br />• Identification of destructive seam sample test locations, observation of <br />destructive seam sample testing, and documentation of test results; <br />• Observation and documentation of geomembrane repairs; and <br />• Observation and documentation of non - destructive pressure testing of <br />fusion seams and vacuum testing of extrusion seams and repairs. <br />The following sections present a detailed description of each of the above activities. <br />AMEC Earth & Environmental, Inc. <br />2000 S Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www amec com <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.