Doc Name
Final Report QA 2011 Phase 5 VLF Ore Storage Aug 26, 2011 vol 1 of 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />performed geosynthetics CQA activities in accordance with the CQA Plan. Geosynthetics <br />CQA activities performed by AMEC included: <br />• Observation and documentation of geomembrane deployment, trial <br />seams, seaming, destructive testing, and non - destructive testing <br />(pressure tests and vacuum tests); <br />• Performing conformance testing of geomembrane; <br />• Measuring geomembrane panel thickness and confirming adequate panel <br />overlap; <br />• Visually inspecting geomembrane sheet quality, sheet grinding, seam <br />alignment, and continuity; and <br />• Retaining archive samples of geomembrane destructive tests and trial <br />seams. <br />1.3 Project Coordination <br />AMEC CQC and CQA activities were directed by the AMEC Project Resident. The AMEC <br />Project Resident (CQA Supervisor) for the construction of the 2011 Phase 5 VLF OSA 2nd <br />Portion for the period January 2009 to August 2011, was Mr. Joseph D. Hickey. The <br />Certifying Engineer and Project Manager, Mr. Jay Janney- Moore, P.E., or his representative, <br />Ms. Kimberly Morrison, P.E., R.G., Project Sponsor, made periodic site visits to resolve <br />technical issues and to review AMEC activities. Appendix C presents a summary of the <br />AMEC staff on -site during the period of January 2009 through August 2011. <br />Representatives of CC &V, Ames, Lone Star, and AMEC conducted daily, weekly, and <br />preconstruction coordination meetings throughout the construction period. <br />1.3.1 Daily Construction Summary Reports <br />AMEC prepared daily construction summary reports as well as photographic documentation <br />(Appendix B) throughout the project to document the key elements of construction and the <br />CQA activities that occurred. On -site AMEC CQA personnel, the Certifying Engineer and <br />the Project Sponsor discussed construction activities on a regular basis. In addition, field <br />AMEC Earth & Environmental, Inc. <br />2000 S Colorado Blvd 2 -1000 <br />Denver, CO 80222 <br />Tel 303 - 935 -6505 <br />Fax 303 - 935 -6575 www amec.com <br />4 <br />