Laserfiche WebLink
FINAL REPORT <br />r-P Q-Qr)KI PROJECT <br />QUALITY ASSURANCE MONITORING AND TEST RESULTS <br />2011 PHASE-5 VALLEY LEACH FACILITY ORE STORAGE <br />AREA 2 nd PORTION <br />August 26, 2011 <br />amec <br />VOIUM-e l of 3 <br />1W, Prepared for: <br />fipple Creek & Victor Gold Mining Company <br />Post Office Box 191 <br />100 North Third Street <br />V <br />T 7199,68 2 <br />Victor, Colorado 80860 <br />Telephone: 71 .689 2 <br />."Facsimile: 719 <br />pn <br />Prepared by: <br />AMEC Earth & Environmentat'­� <br />Colorado Center Tower Two <br />0 S. Colorado Blvd. Suite 2-1000 <br />Denver, Colorado 80222 <br />Telephone: 303.935.6505 <br />Facsimile: 303.935.6575 <br />842011251--_0 <br />c <br />S" 1 / r <br />