My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-27_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2014-02-27_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:23 PM
Creation date
2/27/2014 9:19:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
2/27/2014
Doc Name
Adequacy Review No. 2
From
DRMS
To
Trapper Mining, Inc
Type & Sequence
PR7
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Trapper Mining, Inc. <br />C- 1981 -010; PR7 <br />Adequacy Review No. 2 <br />Page 8 of 15 <br />3.3.3 East Panel Landslide Geotechnical Evaluation <br />20. On page 3 -27b, Stations 5 to 8 have replaced Stations 1 to 4 that were listed previously. For the purposes of <br />continuity, a new paragraph should be inserted at the top of page 3 -27b which gives a brief description of <br />what happened to the original four stations, and when the current stations were placed in service. <br />a. Trapper's Response: linfornnationn has been added to enclosed page 3 -27b addressing site <br />installlationn dates, eqt ipment 6istalllled at each monitoring station, annd removal dates for unndIlVIlduall <br />stations. 1n addition, Figure 3.3.3 -1 (enclosed page 3 -27c) has been updated to reflect current station <br />locations and Table 3.3 4 (unclosed page 3 -27d) is updated to reflect current active locations. <br />Enclosed page 3 -27a is revised to correct a typo. <br />b. Division's Response: Please update the aerial photo snap on page 3 -27c to depict all eight <br />monitoring stations. Also, please include a date on the map for the aerial photograph used. <br />4.08.1 Surface Water <br />21. The current page 4 -173; section 4.08.1.2, discusses haul road culvert sizing. This section references Tables <br />4.8 -1 and 4.8 -1a which are proposed to be replaced with Table 4.8 -2 and 4.8 -2a submitted with the revision. <br />Please update the permit text on this page with the revised table numbers cited. <br />a. Trapper's Response: Page 4 -173 has beenn revised «itln the requested cllnange to tine table <br />ueferunces and is unclosed. <br />b. Division's Response: This item is considered resolved. <br />22. Proposed Table 4.8 -2; Haul Road Culvert Sizing, lists the culverts that exist at the site. The following <br />culverts were added to the table and depicted on the revised M51 maps; ASH -1, ASH -2, BH -1, EMF -1, <br />MZ -1, MZ -2, MZ -3 and MZ -4. It appears these culverts have been installed but were not part of the current <br />approved permit. Also, many culverts are depicted on the M51(Sheet 3) map for proposed culverts that <br />appear to be for the future haul roads to be constructed in the next permit term. Rule 4.03.1(4)(e)(v) <br />indicates that "culverts shall be installed to accommodate flow from the intersecting drainages, and from <br />road surface drainage as necessary to control erosion. Designs for culverts shall be in accordance with <br />4.03.1(4)(e) except where alternative specifications are approved." Permit section 4.08.1.2 indicates culvert <br />sizes are determined by running hydrologic models. For the culverts listed above and the future culverts to <br />be installed, please submit the information/parameters used to determine the proper culvert sizing. Other <br />Operators submit copies of the SEDCAD runs the\, use to design culverts. <br />a. Trapper's Response: Table 4.82 llnas beenn updated to indicate the status of each culvert oun the <br />site. Per perunit section 4.8.1.2 and the regulations, only culverts ki tmdisturbed areas req ire <br />designs. Rule 4,03.1(4)(a)(6'i) states haul roads «ithki disturbed areas will be designed annd <br />constructed using the best technology available. The footnote cohnnn of Table 4.82 indicates <br />whether a particular culvert is placed under a certified haul road built through unndisturbed areas <br />per rule 4,03.1(4)(a)(iv) or is present inn disturbed areas. Appendrt S contains the certified haul <br />road infornnation. Trapper does indeed utillize hydrologic modeling to deterunine the sizing of it <br />culverts, however these models are typically donne as needed at the time of construction and are <br />not retaMed. For the above ueferunced culverts, per the regulations, designs are snot necessary annd <br />«-ere constructed using piratical annallysis of the anticipated runoff. The exceptions is culvert EMF- <br />1 which was sized accoudinng to the cullvert just upstream that was designed maunv years pnor to <br />EMF -1 installlationn. The table denonnstrates that the installed culverts are more tlnaun adequate to <br />haundle auny flow to this structure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.