Laserfiche WebLink
DMG <br /> ;zMS <br /> Add to stipulation 1 under Reporting Groundwater. <br /> N& <br /> 1)Groundwater samples must be collected and baseline data r <br /> assembled by an independent consultant approved by the <br /> Division. <br /> 2)Upon beginning its mining operations, GCC must report all <br /> groundwater sampling results pursuant to the sampling <br /> frequency established by the Division. The Division will e-mail or <br /> send hard copy results to interested parties on request. <br /> Stipulation 2 (replace first paragraph) Weed Management <br /> The operator will submit a noxious weed management plan that <br /> will be prepared in consultation with the local weed control <br /> district or noxious weed management authority. T an must <br /> be submitted and approved by the Division p ' an ' <br /> disturbance occurring on the site. including mining and <br /> construction of any portion of the facility, and should generally <br /> follow the principles outlined in the permit application, but must <br /> contain at a minimum the following elements. <br /> Stipulation$ - 4rought PI " <br /> GCC will develop a Drought Plan" and submit it to the Division �/l <br /> within 90 days of permit approval. <br /> �\ ' -)p \\� k <br /> ��� eo\`h�v <br /> U� <br />