My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-01-09_PERMIT FILE - M2002004
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2002004
>
1999-01-09_PERMIT FILE - M2002004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 8:37:56 AM
Creation date
2/27/2014 9:17:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002004
IBM Index Class Name
PERMIT FILE
Doc Date
1/9/1999
Doc Name
Comments
From
Pueblo County Planning
To
DRMS
Email Name
THM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to PCPC <br /> Re: SUP No. 1999-002 <br /> June 9, 1999 <br /> Page 27 <br /> 14. The applicant's primary fuel material for the cement manufacturing kiln shall be <br /> coal and the secondary fuel shall be natural gas, as indicated in the applicant's <br /> submittal. Use of alternative fuels (such as waste tires or hazardous waste <br /> materials) shall require an amendment to this special use permit. <br /> 15. The applicant shall submit a valid Access Easement or proof of right-to-enter for <br /> the subject lands to the Department of Planning and Development prior to <br /> approval of the Special Use Permit. <br /> 16. The applicant shall submit valid executed mineral leases and/or deeds of <br /> ownership for properties covered by this special use permit prior to approval of <br /> , the Special Use Permit. <br /> f17. Train movements into and out of the plant site shall operate so as not to block <br /> ( the Lime Road crossing longer than normal mainline through-traffic passing the <br /> crossing at slow speed. <br /> 18. Prior to authorization of an Access Permit, the applicant shall submit to the <br /> Department of Public Works detailed construction plans prepared by a licensed <br /> engineer, which cover the necessary road improvements to bring the section of <br /> Lime Road from 1-25 east to the entrance into the site, that will result in the road <br /> Z meeting minimum design standards for a minor collector road, rural cross <br /> section. The plans shall be prepared in accordance with the requirements of the <br /> Pueblo County Roadway Design and Construction Standards. If the access <br /> point lies east of the railroad crossing on Lime Road, the plans shall also include <br /> proposed improvements to the rail crossing on Lime Road, including but not <br /> limited to improved horizontal and vertical alignment and sight distance, <br /> installation of cross arms and signals. <br /> authorization of an Access Permit, the applicant shall s e <br /> Department o orks a detailed e s estimate for the <br /> improvements depicted ' roved by the Department of Public <br /> Works) co ion plans, including improvem , ' n , associated with the <br /> r ' crossing. <br /> 20. Prior to authorization of an Access Permit, the applicant shall enter into an <br /> agreement with the Pueblo County Board of County Commissioners identifying <br /> the portion of the cost of the road improvements to be borne by the applicant and <br /> providing suitable means of guaranteeing that participation, such as a letter of <br />
The URL can be used to link to this page
Your browser does not support the video tag.