Laserfiche WebLink
Poverty Gulch Storm Water Management Area <br />1 Plan View <br />1 " =500 ft (DSize) <br />Poverty Gulch Wafer Management Area <br />including North Cresson Development on West Side <br />Basin I I Basin Basin I I Basin Basin <br />NC-El NC -D1 NC -C1 NC -B1 NC -A1 <br />Until 2015 <br />Until <br />North Cresson /Schist Island Near -term Controls <br />grading ditches along conveniently located Roads to Convey <br />Storm Water to existing Depression Areaat Schist Island <br />Natural Unti12015 Basin <br />Channel I <br />15 Basin <br />PG -B1 <br />Existing Depression <br />near Schist Island <br />Poverty Gulch Storm Water Management Area <br />2 <br />Schematic <br />8.6AF <br />75AF <br />Low <br />UpperS <br />to En;Y 9 <br />120A Ac <br />Grade Ditch <br />/ ;along Existing Roads <br />1'_71P -2t and Prep Existing <br />Depression as <br />r Temporary EMP -08a <br />,o _ Wr u ary p S C <br />z.lh %xE 08-� <br />u1P fi Z <br />� to P <br />85 Z Ac <br />v � . <br />X <br />5 Preparation 2013 <br />Plan View <br />1" =1000 ft (DSize) <br />7 � ✓d"i 04 <br />i -eye i r. <br />98 Ac <br />Tn utary to EMP 9 ' y, <br />Construct EMP -2u � <br />to at least 8.1 AF o <br />F <br />for use in 2015 <br />fiSSA <br />e•., AC Alt <br />i <br />Tributary to EMP -8a 1°I <br />Tdbuta ry to °'������ <br />@ Mme >t0 8a <br />- <br />i _' � Thbutarvra __ <br />End of Year 2014 <br />6 Plan View <br />V =1000 ft (DSize) <br />Legend <br />Basin Name <br />Area PG -X <br />101 Acre 72 cfs -- 400yr Discharge <br />MyrDischarge -. alas 10ACreFeet 2xI6yrVolume <br />E". Channel Name <br />serrz <br />% 100 yr Discharge (cfs) <br />10 -yr Discharge (cfs) <br />s s w■ E■ m Temporary or Existing Channel <br />miMimimimim Proposed New Channel <br />M E 0! 0 1 E I E I E Mining Boundary <br />End of Year 2015 <br />7 Plan View <br />End of Year 2016 <br />Plan View <br />1 " =1000 ft (DSize) <br />End of Year 2017 <br />9 Plan View <br />1 " =1000 ft (DSize) <br />Construct EMP -22 <br />to at Ileast 1.4 AF Capacity <br />Reconstruct Ponds EMP -09b _ <br />c, and d in Back-fill <br />�7,101 <br />A South Globe Hill Mime Area !/ <br />to Single Pond with a / l <br />capacity of 9.5 iAF totai <br />or 6 7 AF Reconstruction <br />- <br />l� �t�86i1! <br />rrr/1F_MP l' <br />09 <br />� Td9/ F+' <br />d 'rte tretat € <br />Tmbut�ry m !� <br />- / <br />8337Acresr` r 4111'� <br />27MR73° Sl G e ✓:' <br />Tabulary m ez <br />�I <br />�� � Nre Mme � Me <br />r> r <br />1 J; EMP -22 <br />t Tributary to - Cil' <br />EMP -21- <br />937 <br />r Acres 55% F f <br />S lope <br />EMP-08a <br />10 End of Year 2018 <br />Plan View <br />1 " =1000 ft (DSize) <br />Fbd 6" + Hv @ Q -24 <br />Bedding: Mirifi Drain Fabric <br />or 6" well graded cobble <br />to sand crushed stone. <br />Channel Dimensions <br />SEDCAD <br />Model & <br />Channel ID <br />Basin <br />10 -Yr <br />Flow <br />(cfs) <br />_y_8__ <br />PG-Dl <br />Avg. <br />Slope <br />(%) <br />Basin Basin <br />Flow <br />Depth <br />(R) <br />Basin PG -C7 PG Al <br />Basin <br />PG -E1 <br />PG -G1 <br />EMP -019 <br />Spillway <br />_ <br />10.OAF <br />�� Unti12015 <br />EMP -022 <br />Secondary Collection Below North Cresson System <br />1_9 AF <br />and Permanent Collection and Delivery to EMP -009 <br />Poverty Gulch Storm Water Management Area <br />2 <br />Schematic <br />8.6AF <br />75AF <br />Low <br />UpperS <br />to En;Y 9 <br />120A Ac <br />Grade Ditch <br />/ ;along Existing Roads <br />1'_71P -2t and Prep Existing <br />Depression as <br />r Temporary EMP -08a <br />,o _ Wr u ary p S C <br />z.lh %xE 08-� <br />u1P fi Z <br />� to P <br />85 Z Ac <br />v � . <br />X <br />5 Preparation 2013 <br />Plan View <br />1" =1000 ft (DSize) <br />7 � ✓d"i 04 <br />i -eye i r. <br />98 Ac <br />Tn utary to EMP 9 ' y, <br />Construct EMP -2u � <br />to at least 8.1 AF o <br />F <br />for use in 2015 <br />fiSSA <br />e•., AC Alt <br />i <br />Tributary to EMP -8a 1°I <br />Tdbuta ry to °'������ <br />@ Mme >t0 8a <br />- <br />i _' � Thbutarvra __ <br />End of Year 2014 <br />6 Plan View <br />V =1000 ft (DSize) <br />Legend <br />Basin Name <br />Area PG -X <br />101 Acre 72 cfs -- 400yr Discharge <br />MyrDischarge -. alas 10ACreFeet 2xI6yrVolume <br />E". Channel Name <br />serrz <br />% 100 yr Discharge (cfs) <br />10 -yr Discharge (cfs) <br />s s w■ E■ m Temporary or Existing Channel <br />miMimimimim Proposed New Channel <br />M E 0! 0 1 E I E I E Mining Boundary <br />End of Year 2015 <br />7 Plan View <br />End of Year 2016 <br />Plan View <br />1 " =1000 ft (DSize) <br />End of Year 2017 <br />9 Plan View <br />1 " =1000 ft (DSize) <br />Construct EMP -22 <br />to at Ileast 1.4 AF Capacity <br />Reconstruct Ponds EMP -09b _ <br />c, and d in Back-fill <br />�7,101 <br />A South Globe Hill Mime Area !/ <br />to Single Pond with a / l <br />capacity of 9.5 iAF totai <br />or 6 7 AF Reconstruction <br />- <br />l� �t�86i1! <br />rrr/1F_MP l' <br />09 <br />� Td9/ F+' <br />d 'rte tretat € <br />Tmbut�ry m !� <br />- / <br />8337Acresr` r 4111'� <br />27MR73° Sl G e ✓:' <br />Tabulary m ez <br />�I <br />�� � Nre Mme � Me <br />r> r <br />1 J; EMP -22 <br />t Tributary to - Cil' <br />EMP -21- <br />937 <br />r Acres 55% F f <br />S lope <br />EMP-08a <br />10 End of Year 2018 <br />Plan View <br />1 " =1000 ft (DSize) <br />Fbd 6" + Hv @ Q -24 <br />Bedding: Mirifi Drain Fabric <br />or 6" well graded cobble <br />to sand crushed stone. <br />Channel Dimensions <br />SEDCAD <br />Model & <br />Channel ID <br />3hannel <br />Name <br />10 -Yr <br />Flow <br />(cfs) <br />_y_8__ <br />100 -yr <br />Flow <br />(cfs) <br />Avg. <br />Slope <br />(%) <br />Bottom <br />Width (ft) <br />Flow <br />Depth <br />(R) <br />Chan, <br />Depth <br />(ft) <br />RipRap <br />D50(nom) <br />North Cresson 1 <br />NC-­E <br />5.1 <br />3.5 <br />0 <br />1.5 <br />2.0 <br />Grass <br />North Cresson 16 <br />NC -C <br />4.9 <br />14.6 <br />3.5 <br />0 <br />1.3 <br />2.0 <br />Grass <br />North Cresson 17 <br />NC -B <br />14.3 <br />34.0 <br />2.5 <br />0 <br />1.7 <br />2.5 <br />3" <br />North Cresson 18 <br />NC -A <br />27.1 <br />56.7 <br />50 <br />60 <br />0.7 <br />3.0 <br />6" <br />North Cresson 20 <br />NC -D <br />3.7 <br />8.3 <br />4.6 <br />0 <br />1.5 <br />2.0 <br />Grass <br />Poverty GI 1 <br />PGA <br />11.2 <br />23.4 <br />8.1 <br />0 <br />1.3 <br />2.5 <br />6" <br />Poverty GI <br />PG -B <br />14.4 <br />29.0 <br />.7 <br />4.0 <br />112 <br />2 <br />3" <br />Poverty GI 3 <br />PG -C <br />9.4 <br />22.5 <br />3.4 <br />0 <br />1.4 <br />2.5 <br />3" <br />Poverty GI 4 <br />PG -D <br />17.6 <br />38.2 <br />15.5 <br />4.0 <br />0.8 <br />2.5 <br />3" <br />Poverty GI 6 <br />PG -E <br />3.6 <br />8.4 <br />14.4 <br />0 <br />0.8 <br />2.0 <br />3" <br />Poverty GI 17 <br />PG -F <br />4.8 <br />10.9 <br />20 <br />0 <br />01.0 <br />2.0 <br />3" <br />Poverty GI 18 <br />PG -G <br />8.8 <br />20.1 <br />5 <br />0 <br />0.6 <br />1.8 <br />6" <br />3 <br />Channel Dimensions <br />Table <br />i <br />i <br />Future <br />;�- ! rnbuta y to f <br />8. ? "7A�es' <br />4 <br />tbutary to r q <br />EMP -21 <br />9.3.7ACres "z afreFn <br />l <br />11 End of Year 2019 to Mine Life <br />Plan View <br />1 " =1000 ft (DSize) <br />13 Post- Reclamation <br />Plan View <br />V=1 ft (DSize) <br />15' _ <br />F(nom) <br />Crest Area (Ac) <br />Sediment Allowance <br />(2 ft.typ) <br />�2 ft. (typ) <br />Spillway <br />Elevation <br />3ase Area ) <br />Pond Dimensions <br />SEDCAD <br />EMP- <br />Depth <br />Area <br />Area <br />Capacity <br />Outlet <br />E Spillway <br />Spillway <br />Model & <br />Name <br />Base <br />Crest <br />@Crest <br />Pipe <br />Width <br />Elev. <br />Stricture ID <br />(ft) <br />(Ac) <br />(Ac) <br />(Ac -Ft) <br />(in) <br />(ft) <br />N. Cresson 1 <br />EMP -8a <br />15 <br />22 <br />.55 <br />10.5 <br />None <br />PovertyGII <br />EMP -09 <br />15 <br />.20 <br />4.5 <br />10.0 <br />None <br />6,0 <br />Varies <br />Poverty G12 <br />EMP -21 <br />15 <br />.09 <br />.0.8 <br />10.0 <br />None <br />6.0 <br />9965.0 <br />Poverty G12 <br />EMP -22 <br />10 <br />.05 <br />0.3 <br />1.6 <br />None <br />6.0 <br />10029.0 <br />Notes_ <br />1. Pond sizes include 2 ft deep allowance for sediment accumulation. <br />2. Emergency Spillways are generally 24- inches below crest. <br />4 EMP- Pond Geometry <br />Table <br />