VOITA <br />Halt <br />{ <br />EMP -018 <br />Plan View <br />1 " =50' (D -Size Dwg) <br />Ew/0 <br />�t!{oJCOSP <br />EGB <br />rEmergency Spillway for EMP - <br />Backt7owfrom Pond through Ditch <br />Total Earthwork <br />Balanced Cut7Fi11- 8,200 CY <br />6 "C4 Riser Pipe <br />Spillway with <br />6- 1 "0 Perforations <br />at12 "centers <br />Cut 4itbelow ` <br />grade and build 5 <br />Embankment <br />to Elee 1005 -s to <br />provide 9.9 Acre feet <br />Capacity y _ <br />Note: EMP-019 is <br />Temporary and will be <br />removed by WHEX It will <br />be replaced after WHEX <br />Backall with Permanent <br />2 EMP -019 <br />Plan View <br />v,=501 (D-Size Dwg) <br />EMP- 017N- Coarse Sediment - - <br />nee Trap - UpgradeExistingpond <br />nee %j <br />ded. Pond wig all Saa nd �// � EMP- 017Main - Rehabilitate <br />and coarse Silt BasingB -1, C -1 and Existing Cameron Pond for Total <br />ounall from EMP -016 Capacity of 19.7 Acre Feet. Pond <br />Designed for Sediment Removal serves as Clear -water pool and <br />efficiency. Eu source for dust - control & <br />construction water <br />12" Outlet Riser with <br />Inlet at El. 10014. Routes a 6 V <br />and reduces flow to EMP- 01 9Main <br />to 6 cis for effectiveness proved settling <br />6" Low level <br />Drain and R'prapo <br />100-yr Spillway to Pump System <br />- - -- Spillway <br />EMP -17 Clear-water Pond Evacuate EMP -017 and use / od <br />- Grass -lined Interceptor water for Dust Control �� \ <br />for Basin ECOSA -C1 _ - <br />S EMP- 017S - Coarse <br />\ Sediment Trap for Basin ECOSA-D1 From Basin <br />Existing pond upgraded as ECOSA -DI 1, 1 <br />necessary. <br />EGO \ <br />i <br />EMP -017 (Rebuilt Cameron Ponds) <br />4 Plan View <br />V =50' (D -Size Dwg) <br />Notes and Genera! s7ecifications: <br />1. The dimensions and construction of ditches are listed on Tables at <br />right, along with the armoring requirements (3" Riprap, 6" Riprap or <br />vegetated channels). The freeboard includes a minimum of 6- inches <br />at the 100 year calculated discharge plus the velocity head depth. <br />2. EMP Ponds and their embankments are intended to be water tight <br />because of their proximity to high walls of the mining areas. <br />Accordingly, they shall be constructed to conform to the following <br />general specifications: <br />a. Strip the footprint of the pond area down to suitable non - organic <br />soils with no less than 15 -20% fines ( <200 mesh). Proof roll the <br />footprint and compact as needed to achieve a target density of no less <br />than 90% in the basin and no less than 95% Std. Proctor in the <br />embankment <br />b. Select soils for the embankment that have at least 15% fines. <br />Place and compact the embankment soils in 8 -inch maximum loose <br />layers and compact to at least 95% Std. Proctor density. <br />c. Maximum slope of embankment shall be 2 :1. Maximum slope <br />inside sediment basin shall be 1.75:1. Maximum slope of reseeded <br />areas shall be 3:1. <br />3. An emergency spillway shall be constructed at each pond with a <br />finished invert elevation approximately 2 -0 feet lower than the crest <br />and a base width of 6.0 feet. The spillway shall be armored with 6" <br />angular rlprap place on 6- inches of sandy - gravel bedding and a layer <br />of Mirifr drain fabric. <br />a ' <br />h'1 b <br />bb� <br />, <br />i <br />j <br />go <br />' w <br />Total Earthwork <br />Balanced CutlFill -3,000 Cy <br />North Interceptor at <br />Toe ofECOSA <br />\\ \, South Interceptor <br />\ at Toe of embankment <br />EMP -020 <br />Plan View <br />1 " =50' (D -Size Dwg) <br />-- Grassy Valley Storm Water Management Area Transfer Pumps - I8 <br />Wild Horse Extension (WHEX) and ECOSA gpm Solar &One cfs <br />Temporary. Basin MI obile @ 100 ft <br />TDH <br />Basin <br />WHEX-81 - Vindicator <br />WHEX -A Basin <br />Basin -- V Basin <br />lN -A1 <br />WHEX -D <br />;[Basin EMP -018 <br />WHEX - -C 5.7AF <br />EMP -010 Temporary *40 m m m o o m s o m~ EMP -013 Spillway <br />■ 1.8 AF <br />19AF Basin ■ <br />- -_ WHEX-E Spillway ■ <br />EMP -019 = J ■ After WHEY <br />9.9AF ■ Backfill, Grassy <br />■ Valley is Restored & <br />to Basin M/ Highway Basins <br />Pond ECOSA_A1 �� Perforated ■ Flow Direct to <br />Perforated Weep Pipe ■ Grassy Leek <br />Weep Pipe _- EMP-06 Drain 0 -- n/o Detention <br />Drain - - -�- 5.2 AF ■ Basin <br />■ ECOSA-E1 <br />■ <br />Clay <br />Basin ■ <br />Area ECOSA-Bt ■ Spillway <br />■ EMP -020 -' <br />Sed Ewip -017 Basin ■ 9.0 AF <br />Tra 19J AF way ECOSA-D 1 ■ <br />[Cos4­C I <br />-------- - - - - -- <br />Upper Grassy Valley Storm Water Management Area <br />(�O)Schernatic <br />A. <br />� <br />t� <br />Existing EMP -016 <br />Verify Capacity at <br />5.2 Acre feet <br />�� !M \�\\\Z\ <br />Existing <br />Riprap Lined <br />Channel <br />from EMP -10 \ <br />Construct Perforated Riser <br />Spillway -6'0Pipewith ` <br />ea.1'oPerf @12 "Centers / <br />�E A <br />channel from NW Toe <br />of ECOSA Stockpile <br />3 Existing EMP -016 <br />Plan View <br />1 " =50' (D -Size Dwg) <br />Total Earthwork <br />BalancedCuty9 -16,0001 <br />Pond Capacity 9Acre Feet <br />Riprap Emergency <br />Spillway <br />10240, I�YdP- 18 <br />� h <br />10160 <br />10200 l L Natural Slope <br />Natural �! Cut through _ -9 <br />9 R <br />Slope -- WHEX Mine Area Backfill - Ridge - <br />10 120 � <br />10080 <br />10040 - <br />100 cfl r\ r\ o rn o 0 o rn t� co of co <br />Q <br />DATUM EL �. � _ N N � o, <br />ti n O O O O O O <br />9950.00 0 0 0 0 0 0 0 Q1 0 0 o O o 0 0 0 Q1 0 0 0 <br />0 +00 5 +00 10 +00 15 +00 20 +00 25 +00 30 +00 35 +00 40 +00 45 +00 <br />PROFILE B, SHEET 3- Reconstructed Stream Corridor Across WHEX after Backfill <br />Profile View <br />1" =500 ft (DSize) <br />6 "0 Riser Pipe <br />15' 6 ea. 1 "0 Holes at <br />(non') 12" Vertical Centers <br />Crest Area (Ac) - 2 ft. (typ) <br />- <br />i � 1 <br />;J <br />� T , <br />�T T <br />spilhvay <br />Elevation <br />Base Area (Ac) <br />Sediment Allowance 1 <br />(2 ft. typ) Pond Dimensions <br />S illlwa <br />SEDCAD EMP- epth Area Area Capacity Outlet E Spillway P Y <br />Structure Name Base Crest @Crest Pipe Width Ellev. <br />ID (ft) (Ac) (A c) (A Fl) (in) (ft) <br />4 EMP -18 15 .22 .55 5.7 6'S 6 10204.0 <br />7 EMP -10 10 .20 .55 3 -9 None 6.0 101125.0 <br />9 EMP -19 10 .375 1.72 9.9 6 7P 6.0 100155.0 <br />11 EMP -16 15 .21 .76 5.2 60P 6 101039.0 <br />15 EMP -17N 8 .131 .283 1.6 12 HS 10.0 101018.0 <br />16 EMP -17M 15 .88 1 -57 19.7 None 6.0 9989 -0 <br />S2 EMP -2o 15 .39 .84 9.0 None 6.0 95742.5 <br />V1 EMP -13 10 10 .27 1 -8 None 6.0- 101100.0 <br />Notes: <br />1. Select Ponds include outlet risers consisting of 6" HDPE Pipe and <br />1,0 perforations, 6 per row, at 12 -inch intervals. <br />2. Pond sizes include 2 ft. deep allowance for sediment accumulation. <br />3. Emergency Spillways are generally 24- inches below Crest. <br />4. EMP Ponds with Perforated Outlet drains are not terminal facilities <br />and may be designed for one 10- yr /24 -hr storm volume since their <br />.� nre no tnmatir,,1lv evacuated to a terminal storage basin. <br />Depth <br />- 2 11 <br />Width <br />Bedding: Mirifi Drain Fabric <br />or 6" well graded cobble <br />to sand crushed stone. <br />Channel Dimensions <br />Fbd <br />6 " +HV@ <br />Q1oo-24 <br />SEDCAD hannel <br />10 -Yr <br />100 yr <br />Avg. <br />\ <br />670 HDPE <br />Chan. <br />SDR17Pipeline <br />Channel Name <br />Replaced with Open <br />rest <br />Ditch after WHEX <br />- . <br />ishackSll ed� ■� ■� - <br />Depth <br />D50(n0m) <br />ID <br />pump Station - <br />Normal Withdrawal 0 -7Acre feet <br />(cfs) <br />with 3 -Solar Pumps in Par"U" <br />�7a 0 psi <br />IOyrStormwithdrawal2.liAcrefeet <br />r Storm <br />1 WH -A <br />usingMobile/Diesel20UPPump <br />17 <br />at 1 cfs/110 ft TDH it <br />l00, <br />4 <br />ea <br />rEmergency Spillway for EMP - <br />Backt7owfrom Pond through Ditch <br />Total Earthwork <br />Balanced Cut7Fi11- 8,200 CY <br />6 "C4 Riser Pipe <br />Spillway with <br />6- 1 "0 Perforations <br />at12 "centers <br />Cut 4itbelow ` <br />grade and build 5 <br />Embankment <br />to Elee 1005 -s to <br />provide 9.9 Acre feet <br />Capacity y _ <br />Note: EMP-019 is <br />Temporary and will be <br />removed by WHEX It will <br />be replaced after WHEX <br />Backall with Permanent <br />2 EMP -019 <br />Plan View <br />v,=501 (D-Size Dwg) <br />EMP- 017N- Coarse Sediment - - <br />nee Trap - UpgradeExistingpond <br />nee %j <br />ded. Pond wig all Saa nd �// � EMP- 017Main - Rehabilitate <br />and coarse Silt BasingB -1, C -1 and Existing Cameron Pond for Total <br />ounall from EMP -016 Capacity of 19.7 Acre Feet. Pond <br />Designed for Sediment Removal serves as Clear -water pool and <br />efficiency. Eu source for dust - control & <br />construction water <br />12" Outlet Riser with <br />Inlet at El. 10014. Routes a 6 V <br />and reduces flow to EMP- 01 9Main <br />to 6 cis for effectiveness proved settling <br />6" Low level <br />Drain and R'prapo <br />100-yr Spillway to Pump System <br />- - -- Spillway <br />EMP -17 Clear-water Pond Evacuate EMP -017 and use / od <br />- Grass -lined Interceptor water for Dust Control �� \ <br />for Basin ECOSA -C1 _ - <br />S EMP- 017S - Coarse <br />\ Sediment Trap for Basin ECOSA-D1 From Basin <br />Existing pond upgraded as ECOSA -DI 1, 1 <br />necessary. <br />EGO \ <br />i <br />EMP -017 (Rebuilt Cameron Ponds) <br />4 Plan View <br />V =50' (D -Size Dwg) <br />Notes and Genera! s7ecifications: <br />1. The dimensions and construction of ditches are listed on Tables at <br />right, along with the armoring requirements (3" Riprap, 6" Riprap or <br />vegetated channels). The freeboard includes a minimum of 6- inches <br />at the 100 year calculated discharge plus the velocity head depth. <br />2. EMP Ponds and their embankments are intended to be water tight <br />because of their proximity to high walls of the mining areas. <br />Accordingly, they shall be constructed to conform to the following <br />general specifications: <br />a. Strip the footprint of the pond area down to suitable non - organic <br />soils with no less than 15 -20% fines ( <200 mesh). Proof roll the <br />footprint and compact as needed to achieve a target density of no less <br />than 90% in the basin and no less than 95% Std. Proctor in the <br />embankment <br />b. Select soils for the embankment that have at least 15% fines. <br />Place and compact the embankment soils in 8 -inch maximum loose <br />layers and compact to at least 95% Std. Proctor density. <br />c. Maximum slope of embankment shall be 2 :1. Maximum slope <br />inside sediment basin shall be 1.75:1. Maximum slope of reseeded <br />areas shall be 3:1. <br />3. An emergency spillway shall be constructed at each pond with a <br />finished invert elevation approximately 2 -0 feet lower than the crest <br />and a base width of 6.0 feet. The spillway shall be armored with 6" <br />angular rlprap place on 6- inches of sandy - gravel bedding and a layer <br />of Mirifr drain fabric. <br />a ' <br />h'1 b <br />bb� <br />, <br />i <br />j <br />go <br />' w <br />Total Earthwork <br />Balanced CutlFill -3,000 Cy <br />North Interceptor at <br />Toe ofECOSA <br />\\ \, South Interceptor <br />\ at Toe of embankment <br />EMP -020 <br />Plan View <br />1 " =50' (D -Size Dwg) <br />-- Grassy Valley Storm Water Management Area Transfer Pumps - I8 <br />Wild Horse Extension (WHEX) and ECOSA gpm Solar &One cfs <br />Temporary. Basin MI obile @ 100 ft <br />TDH <br />Basin <br />WHEX-81 - Vindicator <br />WHEX -A Basin <br />Basin -- V Basin <br />lN -A1 <br />WHEX -D <br />;[Basin EMP -018 <br />WHEX - -C 5.7AF <br />EMP -010 Temporary *40 m m m o o m s o m~ EMP -013 Spillway <br />■ 1.8 AF <br />19AF Basin ■ <br />- -_ WHEX-E Spillway ■ <br />EMP -019 = J ■ After WHEY <br />9.9AF ■ Backfill, Grassy <br />■ Valley is Restored & <br />to Basin M/ Highway Basins <br />Pond ECOSA_A1 �� Perforated ■ Flow Direct to <br />Perforated Weep Pipe ■ Grassy Leek <br />Weep Pipe _- EMP-06 Drain 0 -- n/o Detention <br />Drain - - -�- 5.2 AF ■ Basin <br />■ ECOSA-E1 <br />■ <br />Clay <br />Basin ■ <br />Area ECOSA-Bt ■ Spillway <br />■ EMP -020 -' <br />Sed Ewip -017 Basin ■ 9.0 AF <br />Tra 19J AF way ECOSA-D 1 ■ <br />[Cos4­C I <br />-------- - - - - -- <br />Upper Grassy Valley Storm Water Management Area <br />(�O)Schernatic <br />A. <br />� <br />t� <br />Existing EMP -016 <br />Verify Capacity at <br />5.2 Acre feet <br />�� !M \�\\\Z\ <br />Existing <br />Riprap Lined <br />Channel <br />from EMP -10 \ <br />Construct Perforated Riser <br />Spillway -6'0Pipewith ` <br />ea.1'oPerf @12 "Centers / <br />�E A <br />channel from NW Toe <br />of ECOSA Stockpile <br />3 Existing EMP -016 <br />Plan View <br />1 " =50' (D -Size Dwg) <br />Total Earthwork <br />BalancedCuty9 -16,0001 <br />Pond Capacity 9Acre Feet <br />Riprap Emergency <br />Spillway <br />10240, I�YdP- 18 <br />� h <br />10160 <br />10200 l L Natural Slope <br />Natural �! Cut through _ -9 <br />9 R <br />Slope -- WHEX Mine Area Backfill - Ridge - <br />10 120 � <br />10080 <br />10040 - <br />100 cfl r\ r\ o rn o 0 o rn t� co of co <br />Q <br />DATUM EL �. � _ N N � o, <br />ti n O O O O O O <br />9950.00 0 0 0 0 0 0 0 Q1 0 0 o O o 0 0 0 Q1 0 0 0 <br />0 +00 5 +00 10 +00 15 +00 20 +00 25 +00 30 +00 35 +00 40 +00 45 +00 <br />PROFILE B, SHEET 3- Reconstructed Stream Corridor Across WHEX after Backfill <br />Profile View <br />1" =500 ft (DSize) <br />6 "0 Riser Pipe <br />15' 6 ea. 1 "0 Holes at <br />(non') 12" Vertical Centers <br />Crest Area (Ac) - 2 ft. (typ) <br />- <br />i � 1 <br />;J <br />� T , <br />�T T <br />spilhvay <br />Elevation <br />Base Area (Ac) <br />Sediment Allowance 1 <br />(2 ft. typ) Pond Dimensions <br />S illlwa <br />SEDCAD EMP- epth Area Area Capacity Outlet E Spillway P Y <br />Structure Name Base Crest @Crest Pipe Width Ellev. <br />ID (ft) (Ac) (A c) (A Fl) (in) (ft) <br />4 EMP -18 15 .22 .55 5.7 6'S 6 10204.0 <br />7 EMP -10 10 .20 .55 3 -9 None 6.0 101125.0 <br />9 EMP -19 10 .375 1.72 9.9 6 7P 6.0 100155.0 <br />11 EMP -16 15 .21 .76 5.2 60P 6 101039.0 <br />15 EMP -17N 8 .131 .283 1.6 12 HS 10.0 101018.0 <br />16 EMP -17M 15 .88 1 -57 19.7 None 6.0 9989 -0 <br />S2 EMP -2o 15 .39 .84 9.0 None 6.0 95742.5 <br />V1 EMP -13 10 10 .27 1 -8 None 6.0- 101100.0 <br />Notes: <br />1. Select Ponds include outlet risers consisting of 6" HDPE Pipe and <br />1,0 perforations, 6 per row, at 12 -inch intervals. <br />2. Pond sizes include 2 ft. deep allowance for sediment accumulation. <br />3. Emergency Spillways are generally 24- inches below Crest. <br />4. EMP Ponds with Perforated Outlet drains are not terminal facilities <br />and may be designed for one 10- yr /24 -hr storm volume since their <br />.� nre no tnmatir,,1lv evacuated to a terminal storage basin. <br />Depth <br />- 2 11 <br />Width <br />Bedding: Mirifi Drain Fabric <br />or 6" well graded cobble <br />to sand crushed stone. <br />Channel Dimensions <br />Fbd <br />6 " +HV@ <br />Q1oo-24 <br />SEDCAD hannel <br />10 -Yr <br />100 yr <br />Avg. <br />Bottom <br />Flow <br />Chan. <br />RipRap <br />Channel Name <br />Flow <br />Flow <br />Slope <br />Width (ft) <br />Depth <br />Depth <br />D50(n0m) <br />ID <br />(cfs) <br />(cfs) <br />(%) <br />(ft) <br />1 WH -A <br />9 <br />17 <br />5.8 <br />4 <br />1.5 <br />2.6 <br />3 <br />2 WH -B <br />14 <br />27 <br />3.1 <br />4 <br />.7 <br />1.5 <br />3 <br />3 WH -C1 <br />6 <br />15 <br />7.0 <br />4 <br />.6 <br />1.5 <br />3 <br />WH -C2 <br />23 <br />44 <br />8.0 <br />4 <br />1.0 <br />2.3 <br />6 <br />6 WH -D <br />22 <br />46 <br />10.7 <br />7 <br />0.8 <br />2.0 <br />6 <br />8 WH -E <br />60 <br />120 <br />3.3 <br />6.5 <br />1.8 <br />3.0 <br />6 <br />WH -F <br />2.5 <br />3.4 <br />5.0 <br />4 <br />0.5 <br />1.5 <br />6 <br />Pipe MP -18 <br />1 <br />1 <br />6 PE <br />10 EC -A <br />20 <br />45 <br />4.2 <br />4 <br />1.1 <br />2.3 <br />6 <br />12 EC -B <br />55 <br />106 <br />11.5 <br />6 <br />1 -4 <br />3 -1 <br />6 <br />Pipe EC -C <br />6 <br />6 <br />8 <br />12'PE <br />13 ED -G <br />10 <br />26 <br />1.4 <br />4 <br />.9 <br />1.7 <br />6 <br />14 EC -D <br />10 <br />21 <br />1.4 <br />4 <br />.9 <br />1.7 <br />6 <br />S1A EC -E <br />21 <br />42 <br />4.7 <br />4 <br />1.1 <br />2.3 <br />6 <br />SIB ED -F <br />41 <br />84 <br />4.7 <br />8 <br />1.1 <br />25 <br />6 <br />V1 - Vi -A <br />10 <br />36 <br />25 <br />6 <br />0.6 <br />2.1 <br />6 <br />8 EMP- Pond Dimensions C-)Table <br />Channel Dimensions and Design Specifications <br />Table <br />- - - Cameron Ponds J - <br />- EMP -17 <br />-- � _ - 6tt HDPE Pi eline - <br />_ - - Runoff p <br />Brow Ditch along County Road from EMP -18 to <br />Reconstructed to i <br />Crest of WHEX Mine Area - - EMP -16 (SDR17) - EMP -19 <br />10320 Receive water from all <br />10280 ,� i _ , ; - - ----" --- ------ [exlshng] EMP -'s for reuse as <br />10240 -; 2 „ Vent Construction Water <br />at <br />10200 - <br />10160 - High Point EMP-16 <br />10120 EMP -18 with 7.5 HP <br />[existing] <br />10080 Transfer Pump <br />10040 M o 0 M <r I'- � N o K o N `o -a - - - -6 - -- U3 L6 L6 K L6 o o � o <br />cfl N d ai o N c6 ci co N N o °j °p <br />DATUM EMOV ° ni ai ad co R o 0 <br />e� N N N O O_ O_ A � O O O O O O O <br />0 0 0 0_ o_ o o_ o_ o_ o_ o_ o o_ o_ _o � <br />9980.00 0 0 0 0 0 0 o O_ O o_ o 0 0 _ <br />A +00 20 +00 25 +DO 30 +00 35 +00 40 +00 45 +00 50 +00 55 +00 60 +00 65 +00 70 +00 75 +00 80 +00 <br />0 +00 5 +00 10+00 15 <br />- <br />dO <br />C�)P ROFILE A SHEET 3- Grassy Valley Storm Water Channel and EMP- Ponds Steffens and Associates <br />Profile View Cresson Mine psw5 Water Resources - Emdronmental - Mining Ens <br />1 " =500 ft (DSize) Near victor CO Golden CO 80403 -0: 303.21 L1801 -C: 303.; <br />net lsreru>♦es. Yfr. _ <br />