My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:31:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 3 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�a <br />done during any precipitation, in the presence of excessive moisture (e.g., fog, rain, dew) or in the <br />presence of excessive winds, as determined by the CQA Monitor. <br />F. Following the installation of the geomembrane, an examination of the entire surface shall be <br />conducted to detect potentially harmful rocks or other objects. Any such objects will be removed <br />and the geomembrane repaired by the CONTRACTOR, at no cost to CC &V. <br />3.06 FACTORY SEAMS <br />MANAGER and CERTIFYING ENGINEER may require CONTRACTOR to test up to as much as <br />twenty percent (20 %) of factory fusion welds (non- destructive air pressure test) in the field to verify factory <br />test results. Additional testing at CONTRACTOR's expense will be required if failed tests are obtained in <br />the field. <br />3.07 FIELD SEAMS <br />A. Seam Layout <br />Seams shall be oriented parallel to the line of maximum slope, i.e., oriented down, not <br />across the slope. In corners and odd - shaped geometric locations, the number of field <br />seams shall be minimized. <br />2. No horizontal or base T -seam or tie -in seams shall be closer than five (5) feet from the toe <br />of the slope. Seams shall be aligned to prevent wrinkles and "fish mouths." If a fish <br />mouth or wrinkle is found, it shall be relieved and capped. <br />Panels of geomembrane will have sufficient overlap provided to allow peel tests to be <br />performed on the seam. <br />B. Seaming Method <br />The procedure used to temporarily bond adjacent panels together shall not damage the <br />geomembrane; in particular, the temperature of hot air at the nozzle of any spot welding <br />apparatus shall be controlled such that the geomembrane is not damaged. <br />CONTRACTOR shall use double fusion welding as primary method of seaming adjacent <br />field panels. <br />a. For cross seam tees associated with fusion welding, CONTRACTOR shall <br />patch panel intersections consisting of three or more panels and extrusion weld <br />to a minimum distance of 4 inches on each side of patch. The edge of the sheet <br />shall be ground to a 45° angle prior to welding. <br />Place a protective layer, e.g., insulting plate or fabric, beneath hot welding <br />apparatus after usage. <br />When subgrade conditions dictate, use a moveable protective layer directly <br />below each overlap of geomembrane that is to be seamed to prevent buildup of <br />moisture between sheets and prevent debris from collecting around pressure <br />rollers. <br />Section 02776 Page 15 of 22 September 3, 2008 <br />Geomembrane Revision 1 <br />C: AMEC_CCMPhase 5 VLF \PSSA Cert Report\Appendices\Appendix E \SPECS \02776.r1.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.