Laserfiche WebLink
T 4V 1 � <br />reworked by CONTRACTOR, until acceptable measurements are obtained at no additional <br />cost to CC &V. If tests indicate the Work does not meet the requirements of the <br />SPECIFICATIONS, MANAGER and CERTIFYING ENGINEER will establish the <br />extent of the nonconforming area. The nonconforming area shall be reworked by <br />CONTRACTOR until acceptable test results are obtained at no additional cost to CC &V <br />Prior to any geosynthetics being placed on Bedding Fill, the area will be tested by CQA <br />Monitor. No geosynthetics will be allowed to be placed on frozen material, as defined in <br />Section 3.06, without the area in question being retested by the CQA Monitor. <br />3.07 EQUIPMENT: <br />CONTRACTOR may use any type of earthmoving or excavating equipment unless otherwise noted in the <br />SPECIFICATIONS, provided the equipment is in a satisfactory condition, complies with applicable rules and <br />regulations, is of such capacity that the construction schedule can be maintained as planned by <br />CONTRACTOR, and is approved by MANAGER. <br />* ** END OF SECTION * ** <br />Section 02200 Page 18 of 18 September 3, 2008 <br />Earthworks Revision 1 <br />PAPhase 5 OSA 2011 Cert Report\Appendices\Hppendix E Specifications \02200.d.doc <br />