My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:31:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 3 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. If tests indicate the Work does not meet the requirements of the SPECIFICATIONS, <br />MANAGER and CERTIFYING ENGINEER will establish the extent of the <br />nonconforming area. The nonconforming area shall be reworked by CONTRACTOR until <br />acceptable test results are obtained at no additional cost to CC &V <br />18. Prior to any geosynthetics being placed on Soil Liner Fill, the area will be tested by CQA <br />Monitor. No geosynthetics will be allowed to be placed on frozen material, as defined in <br />Section 3.06, without the area in question being retested by the CQA Monitor. <br />H. Drain Cover Fill <br />1. Drain Cover Fill shall be placed over the geomembrane in the locations shown on the <br />DRAWINGS. <br />Prior to placing the Drain Cover Fill, CONTRACTOR shall verify by visual inspection that <br />the underlying geosynthetics are free of holes, tears, wrinkles, or foreign objects. <br />MANAGER and CERTIFYING ENGINEER will inspect the geosynthetic for wrinkles <br />prior to placement of Drain Cover Fill. As instructed by MANAGER, CONTRACTOR <br />shall "work out" wrinkles to the satisfaction of MANAGER and CERTIFYING <br />ENGINEER prior to placement of the Drain Cover Fill. In all cases, wrinkles shall not be <br />of a size that they could fold back on themselves. Wrinkles greater than one foot shall be <br />removed and repaired by the INSTALLER. <br />CONTRACTOR shall place Drain Cover Fill in a single 24 -inch loose lift. The tracked <br />equipment shall operate only over previously placed Drain Cover Fill. CONTRACTOR <br />shall not operate equipment directly on geosynthetics. Only a dozer with a ground pressure <br />not exceeding 8.7 psi can be used to place Drain Cover Fill. A CAT 12G motor grader, or <br />equivalent approved by CERTIFYING ENGINEER, can be used for Drain Cover Fill final <br />grading. Equipment used for placement will not be allowed to pivot on one track (i.e., no <br />abrupt or sharp turns). There shall be no downhill placement on slopes steeper than 4H:1 V. <br />Material can be placed along contours if buttressed from below. Motor graders shall not be <br />allowed to make abrupt turns, brake suddenly, or dig blade in which results in the tires <br />spinning on the Drain Cover Fill surface. <br />4. Highway compatible Rubber tired construction equipment shall not be allowed to travel over <br />the geomembrane or on top of Solution Collection piping unless a thickness of at least 45 <br />inches of Drain Cover Fill has been placed over the geomembrane and on top of Solution <br />Collection piping. The CONTRACTOR will be required to demonstrate to the <br />MANAGER, DESIGN ENGINEER and CERTIFYING ENGINEER that the equipment <br />and procedures used are not detrimental to the geomembrane and piping, at no cost to <br />CC &V. Off road haul truck traffic shall require a minimum of 60 inches for Cat 773 (or <br />equivalent) of Drain Cover Fill placed over the geomembrane and solution collection piping, <br />and a minimum of 120 inches for CAT 777 (or equivalent) of Drain Cover Fill placed over <br />the geomembrane and solution collection piping. <br />5. When placing Drain Cover Fill the maximum acceptable drop height is 3 feet. <br />6. CONTRACTOR shall operate equipment in a manner that is protective of underlying <br />geosynthetics. If MANAGER or CERTIFYING ENGINEER suspects the occurrence of <br />any damage to the underlying geosynthetics, MANAGER will instruct CONTRACTOR to <br />remove Drain Cover Fill to expose the geosynthetics. CONTRACTOR shall uncover, <br />repair any observed damage of the underlying geosynthetics, in accordance with the repair <br />Section 02200 Page 15 of 18 September 3, 2008 <br />Earthworks Revision 1 <br />PAPhase 5 OSA 2011 Cert Report\Appendices\Appendix E Specifications \02200.0.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.