My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:31:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 3 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />When materials spread on the fill are too dry for proper compaction, CONTRACTOR shall <br />spray water on each layer of the fill and shall work the moisture into the fill by harrowing or <br />other approved means, until a uniform distribution of moisture is obtained. Material that is <br />too wet for proper compaction, as determined by CERTIFYING ENGINEER, shall be <br />removed from the fill and/or spread out and permitted to dry, assisted by disking and <br />harrowing or mixing in dry material when permitted by CERTIFYING ENGINEER, if <br />necessary, until the moisture content is reduced to an amount suitable for obtaining the <br />specified degree of compaction, at no cost to CC &V. <br />9. After each layer of fill material has been placed, spread, and moisture - conditioned, the layer <br />shall be compacted by passing compaction equipment over the entire surface of the layer a <br />sufficient number of times to obtain the required density, as specified herein. <br />Compaction shall be accomplished with equipment and by methods approved by <br />CERTIFYING ENGINEER. If such equipment or methods are found unsatisfactory for <br />the intended use, CONTRACTOR shall replace the unsatisfactory equipment with other <br />types or adjust methods until proper compaction is achieved. Prior to <br />placement of a subsequent lift, the previous lift shall be thoroughly scarified to a nominal <br />depth of 2- inches to provide good bonding between lifts. Scarification shall be <br />accomplished by disking, raking with a grader, or an alternative method approved by <br />CERTIFYING ENGINEER. <br />10. The CQA Monitor will measure the ambient air temperature on an hourly basis. If the <br />ambient air temperature is less than thirty-two degrees Fahrenheit for more than one hour (1) <br />over the preceding twenty-four (24) hours, the CQA Monitor will measure the temperature <br />of the fill to determine if the fill is frozen. "Frozen" is defined as a mean temperature of <br />thirty-two degrees Fahrenheit (32 °F) or less. The CQA Monitor will measure the <br />temperature at a depth of three (3) inches and six (6) inches, recording the lower of the two. <br />Six (6) measurements will be taken per acre, and if the average is below thirty-two degrees <br />Fahrenheit (32 °F), the fill will be considered frozen. If the fill is determined to be frozen the <br />CONTRACTOR may either remove and replace the frozen fill or wait until subsequent <br />temperature monitoring indicates the fill is unfrozen, at no cost to CC &V. <br />11. Overburden slopes shall be compacted using a method specification and graded to meet the <br />grades and dimensions shown on the DRAWINGS. The Bedding Fill subgrade surface will <br />be prepared as identified in Section 2200 of the SPECIFICATIONS. <br />B. Structural Fill <br />Areas to receive Structural Fill will include, but are not limited to, slope reductions, and <br />miscellaneous site grading. <br />2. CONTRACTOR shall condition Structural Fill to a moisture content that allows <br />compaction to the required density and that results in a firm, unyielding surface capable of <br />allowing the movement of vehicles and equipment over the surface without causing rutting <br />or other deleterious effects. <br />CONTRACTOR shall place Structural Fill materials with less than 30 percent rock <br />materials above 3/4 -inch size in maximum 12 -inch loose lifts, and compact to 95 percent of <br />maximum dry density (ASTM D698). <br />Section 02200 Page 9 of 18 September 3, 2008 <br />Earthworks Revision 1 <br />PAPhase 5 OSA 2011 Cert Report\Appendices\Appendix E Specifications \02200A.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.