My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:31:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 3 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r 4p 11 <br />SECTION 02200.0 EARTHWORKS <br />PART 1: GENERAL <br />1.01 SUMMARY: <br />This SPECIFICATION describes site preparation, excavation, stockpiling of soils for earthwork if necessary, <br />and placement of Structural Fill, Select Structural Fill, Coarse Shaft Backfill, Underdrain Fill, Low Volume <br />Solution Collection Fill, Bedding Fill, Leak Detection Fill, Soil Liner Fill, Drain Cover Fill, Fine Shaft <br />Backfill, Pipe Bedding Material, and Granular Filter Material for the valley leach facility. <br />1.02 RELATED SECTIONS: <br />Refer to the following Sections for related work: <br />■ Section 01050.0 - Staking and Construction Certification Documentation <br />■ Section 02776.0 - Geomembrane <br />• Section 02777.0 - Geotextile <br />1.03 TOLERANCES: <br />A. Limits of excavation, Structural Fill, Select Structural Fill, Coarse Shaft Backfill, Underdrain Fill, <br />Low Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill, Soil Liner Fill, Drain Cover <br />Fill, Fine Shaft Backfill, Pipe Bedding Material, and Granular Filter Material for the valley leach <br />facility are defined by the lines and elevations shown on the DRAWINGS. All fill shall be placed to <br />the minimum thicknesses shown on the DRAWINGS. <br />B. Finished grades shown on the DRAWINGS are given in feet, and shall slope uniformly between given <br />spot and contour elevations, without sag or humps. All grades shall provide for natural runoff. <br />C. The Soil Liner Fill and Bedding Fill shall have a minimum thickness of 1.0 foot. <br />D. The Low Volume Solution Collection Fill will have a minimum thickness of 3.0 feet at all times, and <br />the Drain Cover fill will have a minimum thickness of 2.0 feet at all times. <br />E. Clearance of pipes with respect to regulated boundaries will be checked by MANAGER. If <br />clearances are inadequate, CONTRACTOR shall backfill trenches to compaction <br />SPECIFICATIONS and relocate trenches at CONTRACTOR's expense. <br />F. Correction of overexcavation and backfilling shall be to CONTRACTOR's account. <br />1.04 QUALITY ASSURANCE: <br />A. All work shall be monitored and tested in compliance with the requirements of the CQA Plan. <br />B. CONTRACTOR shall be aware of all testing activities outlined in the CQA Plan, and shall account <br />for these activities in the construction schedule. <br />C. All CQA soils testing (both field and laboratory testing) will be the responsibility of CERTIFYING <br />ENGINEER, as identified in the Earthworks CQA plan. CONTRACTOR shall be responsible for <br />Section 02200 Page 1 of 18 September 3, 2008 <br />Earthworks Revision 1 <br />PAPhase 5 OSA 2011 Cert Report\Appendices\Appendix E SpecificationsN02200.rl.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.