My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:31:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 3 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
obtained and forward the sample to a third party geosynthetic laboratory. As a minimum, the following <br />conformance tests shall be conducted; with project requirements outlined in Section 02776, Article 2.01: <br />■ Geomembrane: density (ASTM D1505) <br />carbon black content (ASTM D1603) <br />thickness (GRI -GM8) <br />tensile strength (ASTM D638) <br />All conformance tests shall be performed in compliance with the project SPECIFICATIONS. The CQA <br />Monitor shall review the test results and shall report any nonconformance to the MANAGER, <br />CERTIFYING ENGINEER and the Geosynthetics Installation CONTRACTOR. <br />6.03 CONSTRUCTION MONITORING AND TESTING: <br />The CQA Monitor shall monitor and test all geosynthetic components of the construction to verify that the <br />construction is in compliance with the project SPECIFICATIONS. The CQA Monitor shall identify <br />inadequate construction methodologies or materials which may adversely impact the performance of the <br />facility being constructed and existing structures. Visual observations throughout the construction process <br />shall be made to ensure that the materials are placed to the lines and grades as shown on the DRAWINGS. <br />The CQA monitor shall review the following submittals by INSTALLER during the project: <br />• verification that a qualified land surveyor has verified all lines and grades; and <br />• subgrade surface acceptance certificates for each area to be covered by the lining system, <br />signed by the INSTALLER. <br />The CQA Monitor shall: <br />• Inspect all geosynthetic materials delivered to site. The CQA Monitor shall document any <br />damage and notify MANAGER; <br />• obtain geosynthetic packaging identification slips for verification and generation of an on -site <br />materials inventory; <br />• observe subgrade conditions prior to geosynthetics installation and verify that any <br />deficiencies, as defined in Section 02200 of the SPECIFICATIONS, are corrected; <br />■ observe permanent anchoring of geosynthetics to verify that design and project <br />SPECIFICATIONS are met; <br />■ observe that required overlap distances are met; <br />■ monitor and record ambient air temperatures; <br />■ verify that no continuous horizontal seams are placed on slopes unless approved by <br />CERTIFYING ENGINEER; and, <br />Section 01400.2 Page 6 of 11 September 3, 2008 <br />Geosynthetic CQA Plan Revision 1 <br />SAProiects \1125E CCV CQA \I - Tech Specs \01400.2 rl.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.