My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (5)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:31:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 3 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 2
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T I M-0 <br />such as unsatisfactory test results, will be dealt with directly between the CQA Monitor, INSTALLER , <br />and/or CONTRACTORS. <br />If there is a disagreement among the DESIGN ENGINEER, CERTIFYING ENGINEER and/or <br />MANAGER that can not be resolved among themselves, MANAGER shall present the matter to CC &V <br />with MANAGER related recommendations and CC &V shall decide the matter with such decision being <br />final. <br />PART 4.0 DEFICIENCIES <br />When deficiencies (items that do not meet project requirements) are discovered, the CQA Monitor shall <br />immediately determine the nature and extent of the problem and notify the INSTALLER or <br />CONTRACTOR. If unsatisfactory test results identify a deficiency, additional tests will be performed to <br />define the extent of the deficient area. <br />The INSTALLER or CONTRACTOR shall correct the deficiency to the satisfaction of the CQA Monitor. <br />If the CONTRACTOR is unable to correct the problem, the CQA Monitor will notify the MANAGER and <br />CERTIFYING ENGINEER who will assist in problem resolution. If the solution involves a design <br />revision, the DESIGN ENGINEER shall also be contacted. <br />The corrected deficiency shall be retested and/or approved by the MANAGER and CERTIFYING <br />ENGINEER before any additional related work is performed by the INSTALLER or CONTRACTOR. <br />All retests and related documentation shall be recorded by the CQA Monitor and included in the final <br />Construction Certification Report. <br />PART 5.0 MEETINGS <br />This section identifies and describes the meetings to be held during the coarse of the construction. <br />Meetings shall be held in order to clearly define construction activities and goals in order to facilitate <br />construction. <br />5.01 PRECONSTRUCTION MEETING: <br />The MANAGER will hold a preconstruction meeting at the site prior to the start of construction. The <br />DESIGN ENGINEER, MANAGER, CERTIFYING ENGINEER, CQA Monitor, INSTALLER, <br />CONTRACTOR, and others designated by the MANAGER shall attend this meeting. The purpose of this <br />meeting will be to: <br />• review the construction DRAWINGS, CQA Plan, and project SPECIFICATIONS; <br />• define the responsibilities of each party; <br />• define lines of communication and authority; <br />• review method of documentation, testing procedures, and reporting inspection data; <br />• establish testing protocols and procedures for correcting and documenting construction <br />deficiencies; and, <br />■ discuss any changes that may be needed to ensure that construction will be completed in <br />compliance with the design. <br />Section 01400.2 Page 4 of 11 September 3, 2008 <br />Geosynthetic COA Plan Revision 1 <br />SAProjects \1125E CCV CQA \I - Tech Specs \01400.2 rl.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.