Laserfiche WebLink
O <br />O <br />q-1 <br />cv <br />0 J <br />p0� <br />k <br />• <br />00 <br />,i <br />-F 1 <br />N <br />1 <br />A <br />LEGEND: <br />— EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />SOIL LINER FILL PLACEMENT <br />PREVIOUS SOIL LINER FILL PLACEMENT <br />CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />PHASE 5 SOIL LINER FILL <br />PLACEMENT <br />aftwo <br />EARTH AND ENVIRONMENTAL <br />DESIGNED BY CMT CHECKED BY JDH DATE <br />DRAWN BY CMT APPROVED BY JDH 10/09/1 <br />CADO FILENAME FIGURE No. REV <br />2 0 <br />O <br />O <br />+ <br />o <br />a- <br />2 <br />o� <br />�x <br />CD <br />�^ <br />CD <br />Qs <br />zl� <br />LEGEND: <br />— EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />SOIL LINER FILL PLACEMENT <br />PREVIOUS SOIL LINER FILL PLACEMENT <br />CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />PHASE 5 SOIL LINER FILL <br />PLACEMENT <br />aftwo <br />EARTH AND ENVIRONMENTAL <br />DESIGNED BY CMT CHECKED BY JDH DATE <br />DRAWN BY CMT APPROVED BY JDH 10/09/1 <br />CADO FILENAME FIGURE No. REV <br />2 0 <br />