Laserfiche WebLink
0 <br />N� <br />C9 <br />00% <br />C7 <br />•b / <br />00 <br />O\\ <br />N <br />r <br />C� <br />O <br />O r <br />k <br />�o <br />O <br />O <br />cD <br />o° <br />o� <br />O <br />O <br />W� <br />0 <br />0 <br />OD <br />w <br />BAR <br />O <br />O� <br />N <br />W <br />CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />PHASE 5 GEOMEMBRANE ACCEPTANCE <br />PSSA PRIMARY 100 MIL <br />�II'�'I� DESIGNED BY CMT CHECKED BY JDH DATE <br />DRAWN BY CMT APPROVED BY JON 10/02/1 <br />EARTH AND ENVIRONMENTAL CADD FILENAME FIGURE No, REV <br />4b 0 <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL. FEET <br />N <br />PROPOSED GROUND SURFACE CONTOUR EL. FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />_ <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />ACCEPTED GEOMEMBRANE <br />/ <br />® PREVIOUSLY ACCEPTED GEOMEMBRANE <br />I-lX <br />I <br />/ <br />/0 <br />i <br />/ O <br />O <br />O� <br />N <br />W <br />CLIENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />PHASE 5 GEOMEMBRANE ACCEPTANCE <br />PSSA PRIMARY 100 MIL <br />�II'�'I� DESIGNED BY CMT CHECKED BY JDH DATE <br />DRAWN BY CMT APPROVED BY JON 10/02/1 <br />EARTH AND ENVIRONMENTAL CADD FILENAME FIGURE No, REV <br />4b 0 <br />