Laserfiche WebLink
O <br />O <br />.1L <br />V' 11 <br />O� C <br />I� <br />00.010 /�� , �,. <br />+ <br />0 <br />w <br />0 <br />N <br />� <br />O <br />O <br />4u <br />O� <br />k <br />_-- <br />O <br />00 <br />j W <br />co <br />0 <br />DO <br />00 <br />/ <br />LAJ <br />00 <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />PREVIOUSLY DEPLOYED LINER <br />DEPLOYED LINER <br />NOTES: <br />APPROXIMATELY 206,973 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />APPROXIMATELY 3,234,289 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />CLIENT CRIPPLE CREEK & VICTOR <br />o° GOLD MINING COMPANY <br />PROJECT PHASE 5 VLF <br />_v <br />r TITLE <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />o PSSA PRIMARY 100 MIL <br />(\I DESIGNED BY CWT CHECKED BY JDH DATE <br />Z DRAWN BY CWT APPROVED BY JON 10/02/ <br />CWL <br />E iFi l7Nv1FNT Al CADD FILENAWE GVRE No. REV <br />FI <br />/l — 3c 0 <br />