Laserfiche WebLink
1 <br />O <br />O <br />0 f <br />00 C <br />X <br />., 0 <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />PREVIOUSLY DEPLOYED LINER <br />DEPLOYED LINER <br />NOTES: <br />APPROXIMATELY 58,433 SOUARE FEET OF PRIMARY 80 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />APPROXIMATELY 3,234,284 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />00+0�0 '� <br />o° <br />+ <br />O <br />0 <br />N <br />W <br />A- <br />N <br />' <br />r <br />O <br />O <br />O <br />0- <br />�0 <br />o <br />O <br />+ <br />co <br />c�E "T CRIPPLE CREEK & VICTOR <br />__ <br />GOLD MINING COMPANY <br />_( <br />PROJECT <br />PHASE 5 VLF <br />— — <br />o <br />O <br />2 <br />n,u <br />00 <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />b <br />w <br />0 <br />PSSA PRIMARY 80 MIL <br />v�l <br />DESIGNED BY <br />CMT <br />CHECKED BY <br />I JDH I <br />DATE <br />_N <br />°O <br />°O <br />Q)f <br />Tl <br />DRAWN BY <br />CMT <br />APPROVED BY <br />JDH 10/02/1 <br />\ <br />�� i <br />EARTH AND ENVIRONMENTAL <br />CADD FIL "AWE <br />TIOURE No. <br />3a <br />REV <br />0 <br />