Laserfiche WebLink
G32 +00 <br />a \ <br />O <br />O <br />+ <br />�+ ! 41� <br />f0 <br />C9 , <br />I <br />O <br />O <br />O° DO <br />X LLJ <br />O° <br />O° ^O <br />O <br />o; <br />OI <br />N <br />N '� <br />WE <br />OI <br />O i, <br />N <br />O <br />• 1� <br />X O <br />Cg ^ <br />\x` O <br />00 r D4+ <br />O <br />O <br />0 <br />0 <br />+ <br />W <br />O <br />O <br />W <br />O <br />0 <br />O <br />(N <br />LEJ <br />O° <br />4 �-) <br />o° <br />O <br />i1 <br />0 <br />0 <br />+ <br />2 <br />O <br />O <br />+ <br />N <br />0 <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />Z PREVIOUSLY DEPLOYED LINER <br />�i DEPLOYED LINER <br />O <br />O <br />+ NOTES: <br />N <br />= APPROXIMATELY 237,782 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />O APPROXIMATELY 2,965,430 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />`rO° , <br />Q, <br />WENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />TITU <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA PRIMARY 100 MIL <br />DESIGNED BY CWT CHECKED BY JDH I DATE <br />DRAWN BY CWT APPROVED BY JDH 09/25/1 <br />EARTH AND ENVIRONMENTAL CADD FILENAME FIGURE No. I REV <br />3 0 <br />