My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:20:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 3 OF 3
From
CC&V
To
Drms
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G32 +00 <br />a \ <br />O <br />O <br />+ <br />�+ ! 41� <br />f0 <br />C9 , <br />I <br />O <br />O <br />O° DO <br />X LLJ <br />O° <br />O° ^O <br />O <br />o; <br />OI <br />N <br />N '� <br />WE <br />OI <br />O i, <br />N <br />O <br />• 1� <br />X O <br />Cg ^ <br />\x` O <br />00 r D4+ <br />O <br />O <br />0 <br />0 <br />+ <br />W <br />O <br />O <br />W <br />O <br />0 <br />O <br />(N <br />LEJ <br />O° <br />4 �-) <br />o° <br />O <br />i1 <br />0 <br />0 <br />+ <br />2 <br />O <br />O <br />+ <br />N <br />0 <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PROPOSED GROUND SURFACE CONTOUR EL, FEET <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />EXISTING DRAINAGES <br />Z PREVIOUSLY DEPLOYED LINER <br />�i DEPLOYED LINER <br />O <br />O <br />+ NOTES: <br />N <br />= APPROXIMATELY 237,782 SQUARE FEET OF PRIMARY 100 MIL GEOMEMBRANE DEPLOYED <br />DURING WEEK <br />O APPROXIMATELY 2,965,430 SQUARE FEET OF GEOMEMBRANE DEPLOYED TO DATE <br />`rO° , <br />Q, <br />WENT CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />PROJECT <br />PHASE 5 VLF <br />TITU <br />PHASE 5 GEOMEMBRANE INSTALLATION <br />PSSA PRIMARY 100 MIL <br />DESIGNED BY CWT CHECKED BY JDH I DATE <br />DRAWN BY CWT APPROVED BY JDH 09/25/1 <br />EARTH AND ENVIRONMENTAL CADD FILENAME FIGURE No. I REV <br />3 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.