My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:20:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 3 OF 3
From
CC&V
To
Drms
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />C) Geomembrane Acceptance <br />1) VLF <br />Secondary 100mil geomembrane (S -632 thru S -637, S -753, and S -816 thru S -861) shown on <br />Figure 4 was inspected by AMEC and Lonestar representatives, found to be installed within <br />project specifications and acceptable for continued construction activities. This is the final <br />secondary geomembrane acceptance. <br />D) Geomembrane Delivery <br />1) VLF <br />Three loads (33 rolls) of 80mil LLDPE single sided textured geomembrane rolls were <br />delivered to site during the shift. The load was delivered on a flat bed truck in good condition. <br />The rolls were unloaded using a CAT 950 front -end loader with forks attached. The <br />geomembrane was placed on three pieces of HDPE pipe, stacked two rolls high. An AMEC <br />field representative inventoried the geomembrane and was present at all times during <br />unloading of the geomembrane. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed structural fill placement within the Phase 5 VLF fill area. <br />AMEC inspected and approved subgrade prior to geomembrane deployment. <br />AMEC observed, logged data, and assisted in the installation of geomembrane within the Phase 5 VLF. <br />AMEC observed and inspected anchor trench backfill. <br />AMEC observed the installation of the low volume solution collection system, including the risers. <br />AMEC observed the LVSCF placement constantly. <br />AMEC obtained samples of LVSCF placement. <br />AMEC inspected and approved secondary geomembrane for further construction activities. <br />AMEC observed and inventoried geomembrane delivered to site. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />VLF Weekly Report WE 09.11.10.13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.