My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (4)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:20:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 3 OF 3
From
CC&V
To
Drms
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
483
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec,9 <br />ATTACHMENT A <br />2010 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name <br />SEP 19 <br />SEP 20 <br />SEP 21 <br />SEP 22 <br />SEP 23 <br />SEP 24 <br />SEP 25 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />- <br />Steve Rice <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />- <br />Benjamin Melly <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />Craig Thompson <br />- <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />Kerry Law <br />- <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />Eric Nargang <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />Jeremy Laub <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />- <br />Bill Erickson <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Uwe Kelley <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Reggie Lon <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Amanda Dolezal <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Jennifer Markham <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />Dave Hosely <br />- <br />- <br />- <br />ST <br />ST <br />ST <br />- <br />Madison Crouch <br />- <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />John Lupo <br />- <br />- <br />PCE <br />- <br />- <br />- <br />- <br />Derek Wittwer <br />- <br />- <br />PM <br />- <br />- <br />- <br />- <br />Jay Moore <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />LEGEND <br />PS = <br />Project Sponsor <br />PCE <br />= Project Certifying Engineer <br />PM <br />= Project Manager <br />PR = <br />Project Resident <br />LS = <br />Lead Soils Engineer <br />LG = <br />Lead Geosynthetics Engineer <br />ST = <br />Soil Technician <br />LT = <br />Laboratory Technician <br />GT = <br />Geosynthetics Technician <br />FLM= <br />Field/Laboratory Manager <br />SE = <br />Senior Engineer <br />VLF Weekly Report WE 09.25.10.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.