My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (10)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:18:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, 8 maps 2011 phase 5 valley leach facility ore storage Volume 3 of 3 map hv sol col
From
CC&V
To
DRMS
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
END CAP <br />(NOTE 1) <br />FLOV <br />o� <br />SECONDARY SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />TYPICAL SINGLE TERTIARY TO SECONDAI <br />00 SOLUTION COLLECTION PIPE JUNCTION <br />NTS <br />CPe (TYPE SP) SECONDARY <br />SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />CPe (TYPE SP) SECONDARY <br />SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />�J�IMI�I�IM1111111111111111 :ICI "•I�i�i�l�l:l� <br />ADS N -12 OR EQUIVALENT REDUCER <br />(PIPE SIZES SHOWN ON DRAWING NO. A400) <br />2 TYPICAL SOLUTION COLLECTION PIPE REDUCER DETAIL <br />A400 NTS <br />10' <br />END CAP <br />(NOTE 1) <br />4" DIA. CPe TERTIARY <br />COLLECTION PIPE <br />o� <br />CPe SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING A400 <br />FLOW <br />CPe SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />TEE (PIPE SIZES SHOWN <br />ON DRAWING NO. A400) <br />ATTIWPIVATTVF cnT.TTTTnN rnT.T.FrTTnN PIPE TEE JUNCTION <br />NTS <br />B <br />A410 26" DIA. DR 11 HDPE <br />PERFORATIONS - <br />0 0 0 0 0 0 0 <br />FLOW 0 0 0 0 0 0 0 0 <br />0 0 0 0 O O O 0 <br />0 0 0 0 0 0 0 <br />12" PERFORATION <br />ROW SPACING <br />3 PRIMARY SOLUTION COLLECTION PIPE <br />A400 NTS <br />90' CENTERS (T <br />4 DIA. CPe <br />HIGHWAY GRAD <br />TERTIARY SOLUTI <br />COLLECTION PIF <br />2 MINIMUM DRAIN / <br />COVER FILL j <br />FLOW <br />FLOW <br />CPe SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />WYE (PIPE SIZES SHOWN <br />ON DRAWING NO. A400) <br />CPe (TYPE SP) SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />FLOW <br />FLOW <br />END CAP <br />(NOTE 1) <br />O� <br />FLOW <br />ALTERNATIVE SOLUTION COLLECTION PIPE WYE JUNCTION <br />5' <br />Im <br />CPe COLLECTION PIPE <br />o� <br />CPe TYPE SP) SECONDARY SOLUTION <br />COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />FLOW <br />END CAP <br />(NOTE 1) PLASTIC TIE <br />4" DIA. CPe TERTIARY <br />COLLECTION PIPE - <br />TYPICAL DOUBLE TERTIARY TO SECONDARY <br />4 SOLUTION COLLECTION PIPE JUNCTION <br />EOO NTS <br />DRILL 8- HALF -INCH DIA. <br />HOLES EQUALLY SPACED <br />AROUND PERIMETER <br />/ 45' (TYP.) <br />01 <br />z <br />LL: 26" DIA. DR 11 PERFORATED HDPE <br />w PRIMARY SOLUTION COLLECTION <br />x PIPE SEE DETAIL BB <br />oL <br />J <br />a <br />PLASTIC TIE <br />TYPICAL TERTIARY OR SECONDARY TO PRIMARY <br />SOLUTION COLLECTION PIPE CONNECTION <br />NTS <br />PREPARED FOUND ..... <br />SURFACE FOR SOIL <br />LINER FILL <br />A VLF LINER SYSTEM <br />A400 NTS <br />NOTES: <br />1. ALL CPe PIPES TO TERMINATE <br />WITH MANUFACTURED END CAP. <br />0 0 0 0 0 0 0 <br />... _ .. <br />PRIMARY SOLUTION COLLECTION <br />FLOW 0 0 0 0 0 0 0 FLOW , <br />1 MINIMUM SOIL <br />�- 80 mil SINGLE- - <br />A410 PIPE PERFORATION DETAIL <br />LINER FILL <br />SIDED TEXTURED <br />NTS <br />0 0 0 0 0 0 0 <br />(TEXTURE FACE DOWN) <br />LLDPE GEOMEMBRANE <br />�' <br />\ \ <br />3 <br />11/19/11 <br />ISSUED FOR RECORD OF CONSTRUCTION <br />JNM <br />O O O O O O O <br />01 <br />z <br />LL: 26" DIA. DR 11 PERFORATED HDPE <br />w PRIMARY SOLUTION COLLECTION <br />x PIPE SEE DETAIL BB <br />oL <br />J <br />a <br />PLASTIC TIE <br />TYPICAL TERTIARY OR SECONDARY TO PRIMARY <br />SOLUTION COLLECTION PIPE CONNECTION <br />NTS <br />PREPARED FOUND ..... <br />SURFACE FOR SOIL <br />LINER FILL <br />A VLF LINER SYSTEM <br />A400 NTS <br />NOTES: <br />1. ALL CPe PIPES TO TERMINATE <br />WITH MANUFACTURED END CAP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.