My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:18:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, 8 maps 2011 phase 5 valley leach facility ore storage Volume 3 of 3 Map HV sol col
From
CC&V
To
DRMS
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
END CAP <br />(NOTE 1) <br />FLOM <br />L <br />o� <br />v SECONDARY SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />1 TYPICAL SINGLE TERTIARY TO SECONDARY <br />600 SOLUTION COLLECTION PIPE JUNCTION <br />NTS <br />CPe (TYPE SP ) SECONDARY <br />SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />CPe TYPE SP SECONDARY <br />SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />• � M M M M - - -- N N � � � i � i <br />M M M M I I I I M 2 M M M <br />ADS N -12 OR EQUIVALENT REDUCER <br />(PIPE SIZES SHOWN ON DRAWING NO. A400) <br />2 TYPICAL SOLUTION COLLECTION PIPE REDUCER DETAIL <br />400" NTS <br />END CAP <br />(NOTE 1) <br />10' <br />4" DIA. CPe TERTIARY <br />COLLECTION PIPE <br />0 0 0 0 0 0 0 <br />FLOW 0 0 0 0 0 0 0 <br />0 0 0 0 0 0 0 <br />0 0 0 0 0 0 0 <br />26" DIA. DR 11 PERFORATED HOPE <br />PRIMARY SOLUTION COLLECTION <br />PIPE SEE DETAIL BB <br />PLASTIC TIE <br />TYPICAL TERTIARY OR SECONDARY TO PRIMARY <br />SOLUTION COLLECTION PIPE CONNECTION <br />NTS <br />CPe SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING A400 <br />FLOW <br />of <br />CPe SOLUTION COLLECTION PIPE CPe SOLUTION COLLECTION PIPE v / <br />F (SIZE SHOWN ON DRAWING NO. A400) (SIZE SHOWN ON DRAWING NO. A400) �\ <br />TEE (PIPE SIZES SHOWN <br />ON DRAWING NO. A400) <br />WYE (PIPE SIZES SHOWN <br />ON DRAWING NO. A400) <br />CPe (TYPE SP) SOLUTION COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />ALTERNATIVE SOLUTION COLLECTION PIPE TEE JUNCTION <br />NTS <br />B <br />A410 26" DIA. DR 11 HOPE <br />PERFORATIONS <br />0 0 Iko 0 0 0 0 0 <br />FLOW 0 0 0 0 0 0 0 0 <br />0 0 0 0 0 0 0 0 <br />0 0 0 0 0 0 <br />12" PERFORATION <br />ROW SPACING <br />3 PRIMARY SOLUTION COLLECTION PIPE <br />A400 NTS <br />o� <br />2' MINIMUM DRAIN <br />COVER FILL <br />1' MINIMUM SOIL <br />LINER FILL <br />w <br />FLOW <br />FLOW <br />FLOW <br />END CAP <br />(NOTE 1) <br />END CAP <br />(NOTE 1) <br />FLOW <br />ALTERNATIVE SOLUTION COLLECTION PIPE WYE JUNCTION <br />5' <br />PLASTIC TIE <br />NTS <br />CPe COLLECTION PIPE <br />4" DIA. CPe TERTIARY <br />COLLECTION PIPE <br />o� <br />CPe (TYPE SP) SECONDARY SOLUTION <br />COLLECTION PIPE <br />(SIZE SHOWN ON DRAWING NO. A400) <br />FLOW <br />TYPICAL DOUBLE TERTIARY TO SECONDARY <br />SOLUTION COLLECTION PIPE JUNCTION <br />T- <br />DRILL 8 —HALF —INCH DIA. <br />90' CENTERS (TYP.) — HOLES EQUALLY SPACED <br />AROUND PERIMETER <br />4" DIA. CPe 1:,,� . <br />NOTES: <br />HIGHWAY GRADE <br />TERTIARY SOLUTIOE N 45 <br />COLLECTION PIP' (TYP.) <br />1 <br />WITH CMANUFACTU MANUFACTURED \ / <br />80 mil SINGLE— <br />SIDED TEXTURED <br />(TEXTURE FACE DOWN <br />LLDPE GEOMEMBRAN <br />PREPARED FOUNDATION <br />SURFACE FOR SOIL <br />LINER FILL <br />A VLF LINER SYSTEM <br />A400`' NTS <br />B PRIMARY SOLUTION COLLECTI <br />I10 PIPE PERFORATION DETAIL <br />NTS <br />1� <br />
The URL can be used to link to this page
Your browser does not support the video tag.