Laserfiche WebLink
ISSUED FOR RECORD OF CONSTRUCTION <br />ISSUED FOR RECORD OF CONSTRUCTION <br />LE_ <br />GEN_D_ <br />�s EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />FINISHED GRADE GROUND SURFACE CONTOUR (NOV. <br />AUG. 2011) EL, FEET <br />FINISHED GRADE GROUND SURFACE CONTOUR (NOV. <br />EL, FEET <br />CENTERLINE OF 80' WIDE HAUL ROAD <br />.. l PRIMARY UNDERDRAIN PIPE <br />.. , _ .../ SECONDARY UNDERDRAIN PIPE <br />— — r DAYLIGHT LINE <br />LEAK DETECTION TRENCH <br />— — APPROXIMATE LIMITS OF DIATREME <br />.. i' CERTIFICATION BOUNDARY LIMIT <br />EXISTING UNIMPROVED ROAD/TRAILS <br />EXISTING IMPROVED ROADWAYS <br />i EXISTING DRAINAGES <br />EXISTING <br />POWER <br />LINE <br />(ABANDONED) <br />EXISTING <br />FIBER <br />OPTIC <br />LINE (ABANDONED) <br />EXISTING GAS LINE (ABANDONED) <br />EXISTING FRESH WATER LINE ((ABANDONED) <br />LIMITS OF PSSA <br />LEAK DETECTION SUMP <br />2010 AND <br />2011) <br />NOTES: <br />1. POWERLINES TO BE RELOCATED PRIOR TO CONSTRUCTION. <br />2. THE 80' WIDE HAUL ROAD HAS A MAXIMUM GRADE OF <br />10 %. <br />3, PROPOSED CONTOURS REPRESENT TOP OF SOIL LINER <br />FILL. <br />200 0 200 400 FEET <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY BY CC &V WAS REVISED FROM <br />PARTOONASURVEYKDATA SUPPLIED BYOFORtES FORESIGHT WEST REVISION <br />EYN GEI IN <br />5 -29 -2007. S: \CAD \1125 — CC &V PHASE 5 <br />v /LF \RECV \20070622— PROJECT MAP \061 n0— TOPO— REVISED2.DWG <br />/ JNM <br />JNM <br />CLIENT CRIPPLE IP EM VICTOR <br />MINING COMPANY <br />MJR PROJECT <br />JNM <br />MJR <br />DTW TITLE <br />JNM <br />D1W <br />JNM <br />DTW <br />JLW <br />DISCLAIMER <br />4EFFORTS SECOFRTECHNICAL NFORMAT ONOANDRPRACTICAL EXPEIRIENCE SPECIFIC OTOHITS E <br />ECHNI CAL NFORMATI NISAND PIRACTIICAL EXPERIENCE.NANY ALTERATION OR SUCH <br />ppppTAT10N OF THE DATA OR CONTENTS OF THIS DRAWING SHALL BE AT USER'S <br />SOLE RISK AND WITHOUT ANY LIABILITY OR LEGAL RESPONSIBILITY TO AMEC. <br />JNM <br />PHASE 5 VLF <br />PHASE 5 <br />GRADING PLAN <br />DESIGNED BY JNM CHECKED BY J' <br />DRAWN BY JLW APPROVED BY K <br />FILENAME DRAWING NO <br />1125M145 A220 <br />ISSUED FOR RECORD OF CONSTRUCTION <br />5 11/15/10 <br />RE- ISSUED FOR CONSTRUCTION <br />4 8/31/10 <br />3 4/23/10 <br />RE- ISSUED FOR CONSTRUCTION <br />RE- ISSUED FOR CONSTRUCTION <br />2 9/08/09 <br />1 7/23/09 <br />RE- ISSUED FOR CONSTRUCTION <br />0 9/15/08 <br />ISSUED FOR CONSTRUCTION <br />/ JNM <br />JNM <br />CLIENT CRIPPLE IP EM VICTOR <br />MINING COMPANY <br />MJR PROJECT <br />JNM <br />MJR <br />DTW TITLE <br />JNM <br />D1W <br />JNM <br />DTW <br />JLW <br />DISCLAIMER <br />4EFFORTS SECOFRTECHNICAL NFORMAT ONOANDRPRACTICAL EXPEIRIENCE SPECIFIC OTOHITS E <br />ECHNI CAL NFORMATI NISAND PIRACTIICAL EXPERIENCE.NANY ALTERATION OR SUCH <br />ppppTAT10N OF THE DATA OR CONTENTS OF THIS DRAWING SHALL BE AT USER'S <br />SOLE RISK AND WITHOUT ANY LIABILITY OR LEGAL RESPONSIBILITY TO AMEC. <br />JNM <br />PHASE 5 VLF <br />PHASE 5 <br />GRADING PLAN <br />DESIGNED BY JNM CHECKED BY J' <br />DRAWN BY JLW APPROVED BY K <br />FILENAME DRAWING NO <br />1125M145 A220 <br />