Laserfiche WebLink
amec� nvironmental <br />ATTACHMENT A <br />2010 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name <br />FEB 28 <br />MAR 1 <br />MAR 2 <br />MAR 3 <br />MAR 4 <br />MAR 5 <br />MAR 6 <br />Joseph Hickey <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />- <br />Steve Rice <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />- <br />Mike Glass <br />- <br />LG <br />LG <br />LG <br />LG <br />LG <br />- <br />Alfonso Frias <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />*Tyler Wendlandt <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />Madison Crouch <br />- <br />LT <br />LT <br />LT <br />LT <br />LT <br />- <br />John Lupo <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Derek Wittwer <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />LEGEND <br />PS = <br />Project Sponsor <br />PCE <br />= Project Certifying Engineer <br />PM <br />= Project Manager <br />PR = <br />Project Resident <br />LS = <br />Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = <br />Soil Technician <br />LT = <br />Laboratory Technician <br />GT = <br />Geosynthetics Technician <br />VLF Weekly Report WE 03.06.10.D.doc <br />